Laserfiche WebLink
Prbject Overview <br /> • The site is an active service station <br /> in Crescent City, California <br /> ■ Approx. 750 cy of contaminated soil was <br /> excavated during the tank removal in <br /> 1991 . 1998-compliant tanks were installed <br /> in 1993. <br /> ■ LACO began monitoring groundwater in 1995, at <br /> Wvhich -gime '�'PI-fig concetrat ons were up to o <br /> ug/1 and MtBE concentrations were up t " 10,000-'ug1. <br /> ■ The MtBE plume was approx. 300 feet in length and <br /> may have intercepted or flowed under an unused <br /> domestic well. <br /> L <br />