My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
6540
>
2900 - Site Mitigation Program
>
PR0516471
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 10:53:44 AM
Creation date
2/1/2019 10:05:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516471
PE
2950
FACILITY_ID
FA0012627
FACILITY_NAME
BNSF STOCKTON INTERMODAL FACILITY
STREET_NUMBER
6540
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
18109023
CURRENT_STATUS
01
SITE_LOCATION
6540 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM NO.5-00-113 -4- <br /> CLASS U SURFACE M4PO'UNDMENT <br /> THE BURLINGTON NORTHER AND SANTA FE RAIL AY CO. <br /> STOCKTON INTERMODAA.L FACILITY <br /> SAN JOAQUIN COUNTY i <br /> i <br /> 3. Groundwater Monitoring <br /> The following monitoring program shall be implemented at the facility to determine compliance with the <br /> Water Quality Protection Standards, state action levels, and to monitor impacts to the groundwater by <br /> the surface impoundment. These WDRs require that a groundwater monitoring network will be <br /> established at the facility prior to discharging wase to a Class II Surface Impoundment. At a minimum. <br /> the groundwater rnonitoring network will consists of one upgradient background monitoring well and <br /> thvo monitoring wells located at the downgradient edge of the surface impoundment and one monitoring <br /> well located downgradient from the oil water sep ator. Board staff must approve monitoring well <br /> location and construction details prior to well installation. <br /> Groundwater elevation shall be measured quarterly in all monitoring wells at the facility. Groundwater <br /> elevations shall be plotted to produce a groundwater contour map_ <br /> Each monitoring well shall be purged three times -Its well volume or until dry prior to sampling. Metal <br /> analysis shall be reported as dissolv6d (filter). The Discharger is required to perforin sampling, analysis, <br /> and observations according to the schedule in Table 3, <br /> Table 3- Groundwater Monitoring <br /> Parameters Units Frequency <br /> Field Yarameter <br /> Groundwater Elevation . Ft.,&hundredths,MSL Quarterly <br /> Temperature j °C Semi-Aroually <br /> Specific Conductance umhos/em Semi-Annually <br /> PE( ply number Semi-,Annually <br /> Monitoring Parameters <br /> Total Dissolved Solids mg(L Semi-Annually <br /> Chemical Oxygen Demand mg,/L Semi-Annually <br /> TPH-diesel mg/L Semi-Annually <br /> TPH-od&grease mg/L Semi-Annually <br /> Volatile Organic Compounds ug/L Semi=A„anually <br /> (EPA Method 8260,see Attachment C) <br /> Chloride mg/L Serni-Annually <br /> Sulfate mg/L Semi-Annually <br /> Nitrate -Nitrogen mg/L Semi-Annually <br /> Dissolved Metals (Barium,Copper,Lead, mg/L Semi-Annually <br /> &,Zinc) <br /> 61 'd 8V:VT 00, ZZ inE <br />
The URL can be used to link to this page
Your browser does not support the video tag.