Laserfiche WebLink
• • • Page 2 of 2 <br /> - ESTIMATE - <br /> • Client will be responsible for obtaining all necessary permits,unless otherwise stated above. <br /> • Client must provide copies of USA notices to Woodward Drilling a minimum of three (3)working days before project start. Woodward Drilling will not be <br /> responsible for any damages to underground utilities. <br /> • All required permits are the responsibility of the client <br /> • Damaged tools due to adverse drilling conditions will be charged at cost+15% <br /> • Driller's Well Reports are to be completed and filed by the client through the local,county,and state agencies applicable.Copies of each DWR are to be <br /> sent to Woodward Drilling within 30 days of the invoice date. <br /> Safe access and egress to the worksite is the responsibility of the client. <br /> Client is Responsible for notifying Woodward Drilling of Prevailing Wage or Union Labor agreements,which must be noted above in the estimate notes. <br /> Acceptance of Proposal <br /> Please sign and return a copy of this proposal to indicate the acceptance of the proposal <br /> and conditions before the start of project. <br /> Accepted By: <br /> Client Name: Blackburn Consulting <br /> Signature: <br /> Name (printed): <br /> Title: <br /> Date: <br /> 9/24/2013 5:05:39PM <br />