My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
21930
>
2900 - Site Mitigation Program
>
PR0536189
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 1:46:12 PM
Creation date
2/1/2019 1:14:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0536189
PE
2950
FACILITY_ID
FA0020793
FACILITY_NAME
AUSTIN ROAD BUSINESS PARK
STREET_NUMBER
21930
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22809008
CURRENT_STATUS
01
SITE_LOCATION
21930 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 3 <br /> Zac Crawford <br /> ENGEO <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Monday, March 28, 20114:22 PM <br /> To: Zac Crawford <br /> Subject: RE: One New Piezometer(Monitoring well) in Manteca/Ripon <br /> are you folks working for the landowner? or third party? <br /> and as for a permit,,,sometimes around June or July. <br /> From: Zac Crawford [mailto:zcrawford@engeo.com] <br /> Sent: Monday, March 28, 2011 10:53 AM <br /> To: Mike Infurna [EH] <br /> Subject: One New Piezometer (Monitoring well) in Manteca/Ripon <br /> Good morning Mike, <br /> As discussed attached is a Parcel Map showing the location of the proposed single <br /> monitoring well in Manteca/Ripon. The parcel number is 228-090-08 and the site address is <br /> 21930 S. Austin Road, Ripon, CA. The San Joaquin County District Viewer said it is in <br /> Ripon, but I am pretty sure it has been annexed by the City of Manteca. I will be submitting a <br /> MFR form, well permit application, and mini work plan this week. Please let me know what <br /> the fee will be and when I can schedule drilling (assuming my permit is granted). V&W will be <br /> my contractor for this project as well. <br /> Thanks Mike! <br /> Zac Crawford, CEG <br /> Senior Geologist <br /> �'G <br /> EU <br /> N 0 3 F 0 R P. T f r. <br /> ENGEO Incorporated <br /> 580 N. Wilma, Suite A <br /> Ripon, CA 95366 <br /> (209) 835-0610 Phone <br /> (888) 279-2698 Fax <br /> -Expect Excellence- <br /> '"'*"*Due to the potential that information by electronic media can deteriorate,be damaged,lost or modified <br /> unintentionally or otherwise,use of this electronic data by anyone other than ENGEO Incorporated shall be at the <br /> sole risk of such user and without liability or legal exposure to ENGEO Incorporated. The recipient is responsible for <br /> verifying the accuracy of data against governing hard copy documentation. Recipient assumes all risks in the <br /> changing or modification of data and revisions or updating of hard copy documents.""""' <br /> 4/1/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.