Laserfiche WebLink
0 • <br /> Workplan for Phase II Subsurface Investigation <br /> 3190 Auto Center Circle <br /> Stockton,California 95212 <br /> Partner Project Number 81147 <br /> March 10,2009 <br /> Page 14 <br /> southeast corner of the East Hammer Lane and Highway 99 intersection, which is approximately 1.1 <br /> miles northeast of the subject property. The LUFT site, identified as Arco#0595, is overseen by the San <br /> Joaquin County Environmental Health Department (EHD) as case number 0707. The 12 monitoring <br /> wells of the LUFT site were last gauged on October 21, 2008, and the depth to groundwater ranged from <br /> 65.22 to 70.41 feet bgs. <br /> Report <br /> A written summary of the investigation results will be submitted to the EHD upon completion of the <br /> project. <br /> Signatures of Participating Professionals <br /> Thank you for the opportunity to be of service. If you have any questions regarding this investigation, <br /> please contact the undersigned at(3)10)615-4500. <br /> Sincerely, <br /> n jl <br /> Kerran Pender <br /> Environmental Scientist, <br /> Joseph P. Derhake, PE <br /> President <br /> Attachments: <br /> Figures 1.Site Vicinity Map <br /> 2. Site Plan <br /> 3.Proposed Boring Locations <br />