My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUTO CENTER
>
3190
>
2900 - Site Mitigation Program
>
PR0529644
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 2:03:13 PM
Creation date
2/1/2019 1:55:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0529644
PE
2950
FACILITY_ID
FA0019606
FACILITY_NAME
STOCKTON CADILLAC
STREET_NUMBER
3190
STREET_NAME
AUTO CENTER
STREET_TYPE
CIR
City
STOCKTON
Zip
95212
APN
12802024
CURRENT_STATUS
01
SITE_LOCATION
3190 AUTO CENTER CIR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br /> Site Monitoring and Documentation <br /> A field log of work procedures, including the documentation of the type of equipment <br /> used,field methods, and procedures implemented will be maintained by DEI personnel. <br /> Sample Documentation,Custody,Shipment and Documentation <br /> All samples will be recorded on DEI's Chain-of-Custody records. The labels will include <br /> the project name, sample identification number, sampling depth, the time and date of <br /> sampling, and the sample preservation method. <br /> Sample Handling and Chain-of-Custody <br /> Upon sample recovery and labeling, the sample will be placed in an insulated ice chest <br /> containing "blue ice" and/or ice. The ice chest containing the samples also will be <br /> accompanied with chain-of-custody (COC) documentation. The COC records will contain <br /> the following information: <br /> • Site name <br /> • Site address <br /> • DEI's project number and task number <br /> • Laboratory's name <br /> • Required turn-around time <br /> • Name of sampler <br /> • Signature of sampler <br /> • Sample identification <br /> • Date of sample's collection <br /> • Time of sample's collection <br /> • Matrix of sample collected <br /> • Required analysis <br /> The sampler will visually inspect the samples to ensure that the sample container integrity <br /> is maintained with no apparent leakage or incorrect packaging. DEI personnel will <br /> complete the COC and sign it prior to sample transfer. Whenever the samples are <br /> transferred from one party to another, both parties sign the COC and record the date and <br /> time of transfer. COC records will be completed prior to the sample shipment off-site to <br /> DEI's designated analytical laboratory. <br /> Privileged and Confidential Prepared at the Request of Counsel <br /> NPB-95-RAS-029 DEI Project No.2569 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.