My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACACIA
>
501
>
2900 - Site Mitigation Program
>
PR0508319
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 4:31:07 PM
Creation date
2/1/2019 4:29:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508319
PE
2950
FACILITY_ID
FA0008031
FACILITY_NAME
FORTIFIBER
STREET_NUMBER
501
Direction
E
STREET_NAME
ACACIA
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
501 E ACACIA ST
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05/20/1999 13:16 2095385852 GEOLOGICAL TECHNICS PAGE 03/03 <br /> Gev&Aa1 ecfmics 2nc. 0 Page 2 <br /> Fonzia Corp. <br /> Project No. 774.2 <br /> May 20, 1999 <br /> ■ Water @ 26 ft—TEPH-diesel &motor oil by 8015m(filtered as above) <br /> • Water @ 33 ft — TEPH-diesel & motor oil by 8015m (filtered as above), Semi- <br /> Volatile by 8270 (filtered as above),& 5-metals by 6010(filtered as above) <br /> • GP-15 & 17 <br /> ■ Soil @ 9 ft—TEPH-diesel &motor oil by 8015m <br /> • Soil @ 12 ft— TEPH-diesel & motor oil by 8015m, Semi-Volatile by 8270, & 5- <br /> metals by 6010 <br /> ■ Water @ 12 ft — TEPH-diesel & motor oil by 8015m (filtered as above), Semi- <br /> Volatile by 8270 (filtered as above),& 5-metals by 6010 (filtered as above) <br /> • GP-16 <br /> • Soil @ 12 ft— 5-metals by 6010 <br /> ■ Water @ 12 ft— 5-metals by 6010 (filtered as above) <br /> The water samples tested by method 8270 will be collected in 1-liter amber bottles, un- <br /> preserved. The groundwater samples tested for metals will be collected in plastic bottles, no <br /> preservative. These samples will be altered immediately upon arriving at the lab. <br /> 3.0 SCHEDULE & REPORTING <br /> The drilling and sample collection will be performed on May 24, 1999. The lab will start <br /> processing the samples on May 25, 1999. The report will be submitted to Gail Wiggett of the <br /> CRWQCB-CVR by June 11, 1999. <br /> Ray Kablanow of GTI will supervise the project. A copy of the report will also be forwarded <br /> to SJC FHS/EHD for their files_ <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.