My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARCH
>
3568
>
2900 - Site Mitigation Program
>
PR0544095
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 4:04:07 PM
Creation date
2/4/2019 4:02:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0544095
PE
2950
FACILITY_ID
FA0025080
FACILITY_NAME
ARCO (PROPOSED)
STREET_NUMBER
3568
Direction
E
STREET_NAME
ARCH
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3568 E ARCH RD
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 28, 1991 BALBI&CHANG ASSOCIATES <br /> File No. 1525-69 <br /> We also recommend that our firm be retained to provide construction monitoring and testing <br /> services during construction phase. The purpose of construction observation is to verify <br /> predicted subsurface conditions, to observe compliance with the design concepts, <br /> specifications and recommendations, and to allow design changes if necessary. <br /> V. REPORT LIMITATIONS <br /> This report has been prepared for the exclusive use of ARCO Products Company, Barghausen <br /> Consulting Engineers, Inc., and their consultants for specific application to the proposed <br /> project. The use of this report, its contents, or any part by a party, or its agents, other than <br /> the one for whom this report is prepared, is herewith disallowed. The use of any information <br /> contained in this report for purposes other than those explicitly stated in the report is at the <br /> user's own risk. <br /> The services provided under this contract as described in this report include professional <br /> opinions and judgments based on the data collected. These services have been performed <br /> according to generally accepted soil and foundation engineering practices. The <br /> recommendations contained in this report are based on information obtained from: <br /> 1. Four soil test borings; <br /> 2. The observations of our field engineer; <br /> 3. The results of laboratory tests; and <br /> 4. Data from existing literatures. <br /> The test boring logs do not provide a warranty as to the conditions that may exist at the entire <br /> site. The nature and extent of subsurface soil variations may not become evident until <br /> construction occurs. If subsurface conditions encountered in the field during construction are <br /> different from those described in this report, our firm should be contacted immediately to <br /> provide any necessary revisions to these recommendations. In addition, if the scope of the <br /> proposed construction changes from that assumed in the preparation of this report, our firm <br /> should be notified and a review of the recommendations be performed. <br /> Paoe 16 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.