Laserfiche WebLink
August 28, 1991 BALBI&CHANG ASSOCIATES <br /> File No. 1525-69 <br /> We also recommend that our firm be retained to provide construction monitoring and testing <br /> services during construction phase. The purpose of construction observation is to verify <br /> predicted subsurface conditions, to observe compliance with the design concepts, <br /> specifications and recommendations, and to allow design changes if necessary. <br /> V. REPORT LIMITATIONS <br /> This report has been prepared for the exclusive use of ARCO Products Company, Barghausen <br /> Consulting Engineers, Inc., and their consultants for specific application to the proposed <br /> project. The use of this report, its contents, or any part by a party, or its agents, other than <br /> the one for whom this report is prepared, is herewith disallowed. The use of any information <br /> contained in this report for purposes other than those explicitly stated in the report is at the <br /> user's own risk. <br /> The services provided under this contract as described in this report include professional <br /> opinions and judgments based on the data collected. These services have been performed <br /> according to generally accepted soil and foundation engineering practices. The <br /> recommendations contained in this report are based on information obtained from: <br /> 1. Four soil test borings; <br /> 2. The observations of our field engineer; <br /> 3. The results of laboratory tests; and <br /> 4. Data from existing literatures. <br /> The test boring logs do not provide a warranty as to the conditions that may exist at the entire <br /> site. The nature and extent of subsurface soil variations may not become evident until <br /> construction occurs. If subsurface conditions encountered in the field during construction are <br /> different from those described in this report, our firm should be contacted immediately to <br /> provide any necessary revisions to these recommendations. In addition, if the scope of the <br /> proposed construction changes from that assumed in the preparation of this report, our firm <br /> should be notified and a review of the recommendations be performed. <br /> Paoe 16 of 17 <br />