Laserfiche WebLink
I <br /> TABLE OF CONTENTS <br /> Letter of Transmittal <br /> Executive Summary <br /> Page <br /> I. P;TRODUCTION 1 <br /> A. Project Description 1 <br /> B. Purpose and Scope of Work 1 <br /> C. Authorization 2 <br /> II. INVESTIGATIONS AND FIN TMIGS 2 <br /> A. Site Description 2 <br /> B. Field Investigation and Laboratory Testing 3 <br /> C. Subsurface Soil Conditions 3 <br /> D. Groundwater Conditions 4 <br /> III. DISCUSSIONS AND CONCLUSIONS 4 <br /> IV RECOAIN ENTDATIONS 5 <br /> A. Site Preparation and Grading 5 <br /> B. Wet Season Site Grading 8 <br /> C. Excavation and Backfill 9 <br /> D. Foundation System 10 <br /> E. Concrete Slab-on-Grade 12 <br /> F. Lateral Earth Pressure 12 <br /> G. Underground Tank Installation 13 <br /> H. Pavement Subgrade Preparation 14 <br /> I. Surface Drainage 15 <br /> J. Seismic Consideration 15 <br /> K. Plan Review and Construction Observation 15 <br /> i <br /> i <br /> V. REPORT LrMITATIONS 16 <br /> �i <br /> i <br />