My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARCH
>
3737
>
2900 - Site Mitigation Program
>
PR0544096
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 4:20:26 PM
Creation date
2/4/2019 4:15:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544096
PE
2950
FACILITY_ID
FA0025081
FACILITY_NAME
ARCH ROAD LOTS
STREET_NUMBER
3737
STREET_NAME
ARCH
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3737 ARCH RD
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`..w �.or' <br /> Anheuser-Busch/Arch Road <br /> Site Safety Plan <br /> February 11, 1992 <br /> 3.0 INTRODUCTION <br /> 3.1 Background <br /> Anheuser-Busch Companies has retained Groundwater Technology, Inc. to <br /> perform a site assessment/investigation at their Stockton facility <br /> located at Arch Road, Stockton, California. <br /> 3.2 Purpose <br /> The purpose of the site safety plan is to provide Groundwater <br /> Technology field personnel and subcontractors with an understanding of <br /> the potential chemical and physical hazards that exist or may arise <br /> while the tasks of this project are being performed. <br /> This SSP describes the procedures to be followed in order to reduce <br /> employee exposure to potential health hazards which may be present at <br /> the project site. The emergency response procedures necessary to <br /> respond to such hazards are also described within this SSP. <br /> 3.3 Objective <br /> The primary objective is to ensure the well-being of all field <br /> personnel and the community surrounding this site. In order to <br /> accomplish this, project staff and approved subcontractors shall <br /> acknowledge and adhere to the policies and procedures established <br /> herein. Accordingly, all personnel assigned to this project shall read <br /> this site safety plan and sign the Agreement and Acknowledgement <br /> Statement (Appendix A) to certify that they have read, understood and <br /> agreed to abide by its provisions. <br /> GTI personnel have the authority to stop Mork performed by our sub- <br /> contractors at this site it any work is not performed in accordance <br /> with the requirements of this Site Safety Plan. <br /> 3.4 Amendments <br /> Any changes in the scope of work of this project and/or site conditions <br /> must be amended in writing on the Site Safety Plan Amendment Sheet <br /> (Appendix B) and approved by Health & Safety Manager. <br /> 4.0 HAZARD EVALUATION <br /> 4.1 site Conditions <br /> Potential physical hazards during site operations include drill rig <br /> operations, noise, traffic, underground/overhead utilities, backhoe, <br /> lifting hazards and slip/trip/fall. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.