Laserfiche WebLink
`.d � <br /> Anheuser-Busch/Arch Road <br /> Site Safety Plan <br /> February 11, 1992 <br /> TABLE II <br /> HAZARD SUMMARY <br /> PPE AIR MONITORING - BREATHING ZONE <br /> Job Task Level <br /> Instrument Frequency* <br /> Soil boring D PID or FID At start of work and <br /> samples 15 min to continuously <br /> Monitoring D PID or FID At start of work and <br /> Well Installation 15 min to continuously <br /> Monitoring Start-up of work at each <br /> Well Survey D PID or FID well location <br /> Monitoring Start-up of work at each <br /> Well Development D PID or FID well location <br /> Groundwater Start-up of work at each <br /> and soil sampling D PID or FID well location. <br /> * All air monitoring data must be recorded on the Vapor Monitoring Sheet, <br /> Appendix H. <br /> 12 <br />