Laserfiche WebLink
} <br /> A � <br /> Stantec } r <br /> SECOND QUARTER 2009 OPERATIONS MAINTENANCE AND MONITORING REPORT <br /> SHOP 10 MAINTENANCE STATION <br /> Table of Contents <br /> k• July 31,2009 <br /> Table of Contents <br /> 1.0 INTRODUCTION............................................. .............. ..............................................1-1 <br /> I <br /> 1.1 PROJECT LOCATION AND HISTORY ................. ..... <br /> I � �. <br /> 2.0 FIELD ACTIVITIES ............................................... ........................................:.......2-1 <br /> k � <br /> 2.1 ASISVETS SYSTEM INSTALLATION AND OPERATION,...............................................2-1 <br /> f � . 2.2 GROUNDWATER DEPTH SOUNDING, PURGING, AND'.SAMPLING.............................2-2 <br /> }f 2.3 QUALITY ASSURANCE/QUALITY CONTROL MEASURES............................................2-2 <br /> 2.4 PURGE WATER AND DECONTAMINATION WATER DISPOSAL...................................2-3 <br /> 3.0 SAMPLE ANALYSIS REPORTING........................... .3-1 <br /> 3.1 LABORATORY ANALYSIS OF GROUNDWATER SAMPLES..........................................3-1 <br /> 3.2 MONITORED NATURAL ATTENUATION PARAMETERS........:...................3-1 <br /> 5 <br /> 4.0 REMEDIATION SYSTEM OPERATION AND MAINTENANCE:.......................................4-1 <br /> L. <br /> 4.1 SOIL VAPOR EXTRACTION SYSTEM OPERATION.......`..................................................4-1 <br /> 4.2 AIR SPARGE SYSTEM OPERATION ............................';.,............... ............................4-2 <br /> 5.0 CONCLUSIONS AND RECOMMENDATIONS....:........... <br /> g <br /> ILI3 <br /> � � is Ilus1329 f611secorlprojed-055caltran515tockton-shop 165omSm and gw rsporSing4200912nd q[i 20091g2_69 omm_fnl.doc ` <br />