Laserfiche WebLink
San Joaquin County <br /> Environmental Health De artment <br /> o• c DIRECTOR <br /> 600 East Main Street Donna Horan, REHS <br /> ILL <br /> �' :� Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> Robert McClellon, REHS <br /> r, Jeff Carruesco, REHS, RDI <br /> c4LfkoR��P Website: www.sjgov.org/ehd Kasey Foley,REHS <br /> Phone: (209)468.3420 <br /> Fax; (209)464-0138 <br /> July 15, 2010 <br /> Terrence Fox <br /> California Department of Transportation Districf6 <br /> 2015 East Shields Avenue, Suite 1.00 <br /> Fresno, CA 93726 <br /> Subject: Cal Trans Shop 10 <br /> 1603 B Street - <br /> Stockton, CA,95201 <br /> WORK PLAN:Well Destruction Work Plan APPROVED: [X]. <br /> DATED: JLine 29-,'2010 DISAPPROVED. ['] <br /> PREPARED BY"Geocon Consultants. Inc: . <br /> f ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S.25296.10(c}(3)]: <br /> 1. Destruction of 18 groundwater monitoring and remediation.-wells by pressure grouting, <br /> removal of the. top three feet of the well casings andlinstallation of a mushroom cap of <br /> cement, twelve.inches larger in diameter than the original borehole, over the toa of the <br /> cut casing per San, Joaquin County Well Standards: The grout will be applied with a <br /> tremmie pipe to the bottom of each well <br /> 2. A site specific.health and safety plan will be submitted'prior to start of the fieldwork. <br /> COMMENTS AND CONDITIONS: <br /> 1. Remediation wells VEW-1 and VEW-2 may be abandoned by pressure grouting per San <br /> Joaquin County Well Standards. <br /> 2. Forty-eight hours notice to EHD is required prior to all site fieldwork. <br /> Lori Duncan, Senior REHS <br /> LOP/Site Mitigation Unit IV <br /> c: Jim Barton, CVRWQCB, 11020 Sun Center Drive #200, Rancho Cordova, CA 95670 <br /> Rebecca Silva,'Geocon, 3160 Gold Valley.Drive #800, Rancho Cordova; CA 95742 <br />