t <br /> 05/02/94 Groundwater monitoring wells MW-3 through MW-8 and MW-10 were abandoned <br /> beginning this date, by Ninyo & Moore. In addition, wells MW-9, MW-11, MW-13, <br /> MW-14, MW-16, MW-19, MW-20 and MW-24 were decommissioned by lowering <br /> the top of the well casing to allow for onsite construction. <br /> 09/30/94 Over-excavation of soil near SB-17 was performed starting this date. <br /> 09/07/95 Installation of soil vapor extraction well VW-1. Also, restoration of the wells <br /> decommissioned in May 1994. See Geocon's Problem Assessment Report and <br /> Corrective Action Plan dated December 9, 1996. <br /> 08/06/96 Well MW-11 over-drilled and new well reinstalled in same borehole; MW-25 and <br /> MW-26; VM-2 and VM-1 installed beginning this date. See Geocon's Problem <br /> Assessment Report and Corrective Action Plan dated December 9, 1996. <br /> 08/03/98 Wells MW-26 and VW-1 destroyed to make room for construction of a new shop. <br /> 02/08/99 Human Health Risk Assessment/Groundwater Impact Analysis was submitted by <br /> Woodward Clyde. <br /> 03/01/00 Depth discrete sampling with a Kabis sampler and a slug test were performed. <br /> See Additional Groundwater Study submitted this date by URS Greiner <br /> Woodward Clyde. <br /> 11/15/01 Beginning date of site investigation work; well MW-14 destroyed and reinstalled, <br /> CPT boring and sampling boring installed. See Geocon's Monitoring Well <br /> Destruction/Installation Report dated December 26, 2001. <br /> 06/03/05 Four air sparge points (ASW-1 through ASW-4) and two vapor extraction wells <br /> (VEW-1 & VEW-2) installed beginning this date. See Secor International Inc.'s <br /> Second Quart=er 2005 Operations Maintenance and Monitoring Report dated <br /> August 5, 2005. <br /> 12/01/05 Remediation of the site began with startup of the soil vapor extraction air <br /> sparging SVE/AS system. The system operated until June 25, 2009. Three <br /> rebound events were conducted prior to shut down. The system removed <br /> approximately 28,150 pounds of hydrocarbons during its operation. <br /> 10/08/09 Two confirmation soil borings were advanced and three shallow temporary soil <br /> vapor wells were installed onsite. See Stantec's Closure Report Caltrans <br /> Stockton Shop 10 dated December 2, 2009. <br /> 12/02/09 Closure Report Caltrans Stockton Shop 10 submitted this date by Stantec. In the <br /> Report Stantec recommends site closure. Soil and groundwater contamination <br /> has been remediated to the point practicable; remaining soil contamination is <br /> longer chain diesel, groundwater concentrations are declining, soil vapor results <br /> indicate no unacceptable heath risks, and concentrations of 1,2-DCA will reach <br /> the MCL within 4.5 years. <br />