My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1603
>
3500 - Local Oversight Program
>
PR0543430
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 11:08:01 AM
Creation date
2/5/2019 9:38:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543430
PE
3528
FACILITY_ID
FA0009377
FACILITY_NAME
CAL TRANS MAINT SHOP 10
STREET_NUMBER
1603
Direction
S
STREET_NAME
B
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16918002
CURRENT_STATUS
02
SITE_LOCATION
1603 S B ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 1. Driving to and from the site Job Safety Analysis (JSA) <br /> • <br /> !Christina DeJarlais OE Coordinator 10/4/2006 <br /> GarySparks Project Geologist 121512006 <br /> r <br /> Anthony Evans Project Geologist 12/6/2006 <br /> X Michael Philipp West Region Health and Safety 10/4/2006 <br /> Mana er <br /> 12/6/2006 Michael Philipp West Region Health and Safety <br /> Manager <br /> Site specific edits to this JSA were made by 8/27/2009 K.Wood <br /> If most recent review date is more than six months old, then this JSA must be updated and reviewed again to remain current #r <br /> POG is the JSA development'Point Of Contact' <br /> Field staff must review job-specific.work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but <br /> not limited to, permitting, access agreements, and notification to required contacts(e.g. site managers, inspectors, clients, subcontractors, etc.): A tailgate safety" <br /> meeting must be performed and documented at the beginning of each workday. Plan, Prevent, Execute (PPE)/Safe Performance Self Assessment(SPSA) <br /> procedures must be used throughout the project. Weather conditions (heat, cold, rain, lightning) must also be considered. Each employee is empowered, expected, <br /> and has the responsibility to stop the work performed by himlherseif or another co-worker if the working conditions or behaviors are considered unsafe-All employees <br /> should actRroactivel to identify and miti ate hazards to the safest extent of their ability. <br /> IN <br /> Perform HRACISPSA Wear reflective vest for traffic, Slip/trip/falls, struck by • Assess the potential hazards: Analyze how to reduce the risk. <br /> procedures. steel toed and shank shoes, traffic StanteclContractor <br /> long sleeve shirt, hardhat, • Review JSA StanteclContractor <br /> safety glasses with side <br /> shields, and leather gloves as <br /> necessary... <br /> Verify Journey Unexpected traffic detours • Understand directions prior to commencing travel <br /> Management Plan is StanteclContractor <br /> complete and current • Pull the vehicle into a safe location if additional directions must be <br /> confirmed StanteclContractor <br /> • Increase following distance to allow extra time to stop if you are in <br /> unfamiliar territory-StanteclContractor <br /> STANTEC Consulting Corporation <br /> 13-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.