Laserfiche WebLink
177 r= r r !, r.-__" l7_—11177-7 Elm= ice__: f177, 17_77 C-7 7 r-l" �'r 117-7 r77 <br /> Task 2. Groundwater sampling <br /> Michael Philipp West Region Health and Safety 9123/2005 <br /> Mana er <br /> Michele Boswell 9/23/2005 <br /> Stephen Zayko Associate Engineer 1/13/2006 <br /> Ivonne Rivera Staff Engineer/intern 2/3/2006 <br /> Eric Miller RE Support#3 Purity and BeeJay 3/8/2006 <br /> Scales <br /> 2/2/2006 Michael Philipp West Region Health and Safety- <br /> Manager <br /> afetyMana er <br /> $12712009 Kimberly Wood <br /> Site specific edits to this JSA were made by <br /> If most recent review date is more than six months old, then this JSA must be updated and reviewed again to remain current <br /> POC is the JSA developrnent'Point Of Contact' <br /> 1 ield staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but <br /> not limited to, permitting, access agreements, and notification to required contacts (e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety <br /> meeting must be performed and documented at the beginning of each workday. Plan, Prevent, Execute (PPE)/Safe Performance Self Assessment(SPSA) <br /> procedures must be used throughout the project. Weather conditions (heat, cold rain, lightning) must also be considered.- <br /> employee isempowered,,,expected,. <br /> andhasthe ri�sponsibility_to stop the vuark-performed by himlherself or another co=worker iftfie workln conditions or behaviors are considered unsafe.All employees <br /> should act roactivel to identi and miti ate hazards to the safest extent of their abili <br /> STANTEC Consulting Corporation <br /> 13-11 <br />