My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1603
>
3500 - Local Oversight Program
>
PR0543430
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 11:08:01 AM
Creation date
2/5/2019 9:38:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543430
PE
3528
FACILITY_ID
FA0009377
FACILITY_NAME
CAL TRANS MAINT SHOP 10
STREET_NUMBER
1603
Direction
S
STREET_NAME
B
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16918002
CURRENT_STATUS
02
SITE_LOCATION
1603 S B ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
177 r= r r !, r.-__" l7_—11177-7 Elm= ice__: f177, 17_77 C-7 7 r-l" �'r 117-7 r77 <br /> Task 2. Groundwater sampling <br /> Michael Philipp West Region Health and Safety 9123/2005 <br /> Mana er <br /> Michele Boswell 9/23/2005 <br /> Stephen Zayko Associate Engineer 1/13/2006 <br /> Ivonne Rivera Staff Engineer/intern 2/3/2006 <br /> Eric Miller RE Support#3 Purity and BeeJay 3/8/2006 <br /> Scales <br /> 2/2/2006 Michael Philipp West Region Health and Safety- <br /> Manager <br /> afetyMana er <br /> $12712009 Kimberly Wood <br /> Site specific edits to this JSA were made by <br /> If most recent review date is more than six months old, then this JSA must be updated and reviewed again to remain current <br /> POC is the JSA developrnent'Point Of Contact' <br /> 1 ield staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but <br /> not limited to, permitting, access agreements, and notification to required contacts (e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety <br /> meeting must be performed and documented at the beginning of each workday. Plan, Prevent, Execute (PPE)/Safe Performance Self Assessment(SPSA) <br /> procedures must be used throughout the project. Weather conditions (heat, cold rain, lightning) must also be considered.- <br /> employee isempowered,,,expected,. <br /> andhasthe ri�sponsibility_to stop the vuark-performed by himlherself or another co=worker iftfie workln conditions or behaviors are considered unsafe.All employees <br /> should act roactivel to identi and miti ate hazards to the safest extent of their abili <br /> STANTEC Consulting Corporation <br /> 13-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.