Laserfiche WebLink
i # <br /> ATTACHMENT 4 <br /> PRE-DRILLINGIEXCAVATION CHECKLIST AND UTILITY CLEARANCE LOG <br /> PROJECT: <br /> LOCATION: DATE: <br /> UTILITY LOCATOR: UTILITY LOCATOR PHONE#: <br /> BATE OF LOCATOR REQUEST: LOCATOR CALL REFERENCE#: <br /> Instructions: This checklist is to be completed by STANTEC personnel prior to initiation of freid activities as a safety measure to insure that all <br /> underground utility lines,other underground structures and above-ground power lines are clearly marked in'the area selected for boring or excavation. <br /> f DRILLING OR EXCAVATION WORK MAY NOT PROCEED UNTIL ALL UTILITY SERVICES LISTED IN SECTION 8.0 OF THIS HASP HAVE BEEN <br /> CONTACTED AND THIS CHECKLIST HAS BEEN COMPLETED. 1F ANY OF THE QUESTIONS!ANSWERED BELOW ARE ANSWERED"NO",THEN <br /> PROJECT MANAGER MUST BE CONTACTED AND CONCERNSIISSUES DISCUSSED. Document the reason for a"NO"answer omthe back of this <br /> form. <br /> Type of Utilities and Structures Not Present How Marked(Flags, paint on pavement,wooden stakes,etc.) <br /> Present <br /> Petroleum product line <br /> a <br /> f � <br /> Septic tank/drain field <br /> + Other <br /> YES NO PRE-MOBILIZATION <br /> Is a scaled site plan, map or drawinq showing the proposed borehole locations attached to this form? <br /> Does each borehole location allow for clear entry and exit, adequate workspace, and a clear path for raising the mast and <br /> operating the drill rig and all support equipment?Ensure 20 feet of clearande distance between the mast and electrical lines <br /> t (STANTEC H&S Policy and 29 CFR 1926.550). Check with the power utility company. <br /> Are all of the proposed borehole locations and associated areas of pavement cutting at least 10 feet from any subsurface or <br /> above-ground utilities shown on client's building plans? STANTEC PM check here El if plans not provided by client(therefore <br /> not applicable to this job). <br /> Are all of the proposed borehole locations and associated areas of pavement cutting at least 10 feet from any subsurface or <br /> above-ground utilities shown on public right-of-way street improvement or other public property plan or site map? PM check <br /> here 0 if not applicable to this ob. <br /> Has the Site Representative,familiar with the site,such as a construction manager,:indicated no knowledge of any subsurface <br /> or above-ground utilities within 10 feet of the proposed borehole locations?, Is the Site Representative qualified to make such <br /> i a determination? <br /> Are all of the proposed borehole locations and associated areas of pavement cutting at least 10 feet from any subsurface <br /> utilities identified during a geophysical survey?Applicable: Yes I No <br /> t Have all Utility Locating Service providers notified by the public line locator marked out their facilities in the vicinity of the <br /> �t. borehole locations or otherwise notified us that they do not have any facilities near the proposed borehole locations? <br /> Are all proposed borehole locations and associated areas of pavement cutting at least 10 feet from a visual line connecting <br /> two similar looking manhole covers? <br /> Are all proposed borehole locations and associated areas of pavement cutting at least 10 feet from a visual line perpendicular <br /> to the street from the water, as and electrical meters? <br /> Are all proposed boring locations and associated areas of pavement cutting;clear of pavement joints, curbs,crash posts,or <br /> other engineered structures? <br /> Does the pavement lack signs of previous excavation(e.g. no pavement subsidence, no differences in pavement texture or <br /> + relief, no pavement atchin ? If there are signs,determine the purpose ofithe revious excavation and act accordingly. <br /> Before drilling have you hand dug/used a water jet VacTron unit/tile probe/etc., to dig a hole 5 feet below grade if possible, <br /> and is the diameter of the hole at least 2 inches greater than the outer diameter of the drilling auger? <br /> Does the soil you encountered in the hand-dug hole appear to be native material(i.e.free of clean gravel,clean sand, <br /> aqqreqate base[gravelly sand with—10%fines], or other non-native looking material)? <br /> f �f Have you made sure that you have identified all the expected utilities or have made sure that you can explain any missing <br /> f utilities? <br /> Have the above concerns been discussed with the STANTEC Project Manager? Yes' ! No <br /> Have the above concerns been discussed with the client? Yes ! No <br /> Have you made a reasonable effort to resolve the above issues? Yes ! No <br /> Approval to proceed provided by: Client Representative Name Title and Date: <br /> 444 Approval to proceed provided by: STANTEC Representative Name Title and Date: <br /> STANTEC Field Technician Name: Title and Date: <br /> STANTEC Consulting Corporation <br /> Attachment 4 <br /> :� ,l <br />