Laserfiche WebLink
! I <br />' clsr cry v r, �nuTE iai°il PRo�ecil vIEEr s�sers <br /> 01.5 mm i s"} sch 40 Pvc ABBREV I AT I ONS: 10 x x <br /> PIPE FOR SOIL VAPOR AHS ACRYLONITRILE BUTaNIENE SIPYRENE • E <br /> [NFL FROM 'NELLS ASW AIR SPARGE WELL �3 <br /> 25.4 mm (1"I ABS INDUSTRIAL BIF7C �'q. <br /> • VEW-1 4N0 VEW-2 PVC POLYVINYL CHLORIDE Ausr u- THBpx� ar a\ <br /> PIPE FCR SPARGE AIR TO SCh SCHEDULE , REG1ER{V CIVIL EcIeEEaio' \ <br /> WELLS ASW-I THROUGH ASW-4 <br /> SVE SOIL VAPOR EXTRACTION <br /> - vEw VAPOR EXTRACTION WELL au rs <br /> ALA45 APPROVAL OeTE <br /> p <br /> 76.2 mm {7") GALVANIZED <br /> - - rre sra.e ar emrra.Na e.ns drr«.s ar <br /> w <br /> RIGID PIPE ELECTRICAL CONDUIT ,—VAPOR EXTRACTION MANIFOLD 152-4 mm TO 228.6 mm <br /> r^m (SEE ELECTRICAL DETAILS) (SEE CONSTRUCTION DETAILS) I6" TO 9"} � pLa <br /> a <br /> > 25.4 mm (I 'I COPPER PIPE ON CENTER <br /> Lz - - CNfranr xw!xu a we4 s!7e?Ta ye!fo Ih wetr si!G qv 1a nta//wxweNcvgw <br /> AIR SPARGE MANIFOLD <br /> w ¢ �(S£E CCNSTRUCTEON DETAILS} <br /> TRANSITION rCOUPLING \ <br /> CATALYTIC OXIDIZER <br /> INLET PIPING (SEE X X X X MANIFOLD SUPPORT <br /> -s CONSTRUCTION DETAILSI - (SEE CONSTRUCTION pE TAILS} <br /> X <br /> E <br /> E TEMPERATURE GAUGE <br /> -17.78�C TO 121.0°C <br /> X E I I I {0�-250� FI <br />• N 6 m I I I I I I <br /> � t <br /> — ' - <br /> X 25.4 mm EI") <br /> �A85 INDUSTRIAL UNION. <br /> CATALYTIC ' <br /> OXIDIZER 25.4 mm 11"� <br /> GdLVANiZED STEEL 1.52 25.4 mm li"I <br /> PIPE FROM SPARGE d65 INDUSTRIAL FIRE <br /> o COMPRESSOR f5'-0"I <br /> — <br /> —HEAT REDUCING PIPE {�EERETE CONSTRUCPMONTOETAEL51 <br /> a w s o PAS <br /> E - ISEE CONSTRUCTION DETAILS] <br /> - HEAT REDUCING PIPE DETAIL <br /> V <br /> NOT TO SCALE <br /> 203.2 mm {B') b.2 mm (1/4"1 LAB COCA VALVE <br /> — ON CENTER / WITH REDUCINC TEE iT!D OF 5) <br /> 2-4q m 0-2540 mm 19"-ICO'] <br /> 0 Cr rw-' WATER VACOLikI GAUGE � r101.T mm ) 152.4 ER <br /> F y IB' 0"1 X (Typ OF 21 <br /> ! (4" TO 6") ON CENTER (TypY <br /> --�¢ c —25.4 mm II I � X5.4 mm f1"I 4B5 INDUSTRIAL <br /> ! GALVANIZED 101.6 mm {4"I <br /> 0 N / STEEL PIP4NG I BALL VALVE [I <br /> 0 1 BALL VALVE iTyp 0= 2Y 1 ! ! yp OF a} <br /> Z o <br /> 6_ z - _ 0-4054mm (o-100 Ps ql <br /> 1 <br /> PRESSURE GAUGE <br /> X 75.4 <br /> ABS I NUNS TR I AL'P I'F'I NG - <br /> 1 FROM HEAT REDUCING PIPE <br /> oy .n s,M i i I I �MANIFOID SUPPORT <br /> (SEE CCNSTRUCTIGN OETaILSi <br /> E.1 <br /> SOR <br /> o TO CATALYTIC .IIJ' <br /> CONCRETE EOU[PMENT BASE X OXIDIZER <br /> � fSEE CONSTRUCTION DETAIL-,) <br /> INLET PIPINC— j I i I CONCRETE EQUIPMENT BASE <br /> a X WELLS <br /> X X SEE.CONSTRUCTION DETAILS) <br /> a E 101.6 mm (4"} _� �,� 75.4 mm 11"7 <br /> SCh 80 PVC tIF?OMI TO AIR ABS INDUSTRIAL PIPE <br /> P.[PE IT7P1 SOIL VAPOR SPARGE <br /> 0.91 m 1.05 mT o EXTRACT[ON 'SELLS <br /> Ir0"-0"1. <br /> � 1.52 m <br /> FENCE (TYPE CL-2.171 1 (5'-0"1 <br /> 0 0 VAPOR EXTRACTION AND <br /> AIR SPARGE PIPING MANIFOLD DETAIL <br /> NOT TO SCALE @. <br /> z <br /> 0 <br /> W — — — — <br /> ALL DIMENSIONS ARE 1N MILLIMETERS <br /> R/w t UNLESS OTHERWISE SHOWN <br /> N CONSTRUCTION DETAILS L� <br /> SVE SYSTEM LAYOUT PARTIAL PLAN As SHOWN ao <br /> � <br /> :zs C-9 �o <br /> �o <br /> • RELe r1 VE BOssOER SCALE O M a0 60 BO <br /> i5 IN LILT Ir+E rEAS IpL�pF IAC _r+AEz 51 GU 00000 EA 000000 <br />