Laserfiche WebLink
V V <br /> Project personnel are expected to arrive at the jobsite and be well rested and physically prepared to <br /> perform assigned tasks. <br /> 3.0 HAZARD AND CONTROL ANALYSIS <br />€ The following hazards were assessed to either exist; or have the potential to develop, during the <br /> Iw performance of the project activities: <br /> HAZARDS <br /> U ¢ �h U a it <br /> f z �U F rW I U I {7 U W <br /> TASKS U f F_ O; O f O W F" <br /> z' :4 O <br /> � i <br /> Work-related Driving X <br /> Well Destruction Activities X X XI. I X 1j'I I X <br /> 3.1 Safe Driving <br /> Hundreds of workers are injured or die in job-related motor vehicle accidents annually. Motor vehicle <br /> accidents are one of the number-one causes of employee injuries,and deaths. Most accidents can be <br /> avoided by practicing defensive driving. Geocon policies mandate that employees: <br /> • Prepare themselves and their vehicle for the road before travel;';: 0: <br /> �3 <br /> • Drive according to posted speed limits unless adverse conditions necessitate slower speeds; <br /> • Never tailgate,employ the three(3) second rule in following vehicles;" <br /> Follow California State Law and other local laws and regulation's regarding the use of cellular <br /> phones for communication while driving; <br /> !x <br /> + Additionally,talking on a cell phone and/or texting is prohibited while working near drill rigs or <br /> operating sampling equipment; and, !� ^ <br /> E <br /> • Use practical driving procedures in cities, on the freeway, and iri rural areas. <br /> 3.2 Mechanical Hazards <br /> Type(s)/Source: <br /> • Material Handling/Back Injury <br /> • Striking(slips,trips); and <br /> + Struck-by injuries <br /> Qualified Exposure Risk: Moderate xr <br /> Shop 10 MS,Task Order No.94 Caltrans Contract No.06A l 141,EA 43-910076 <br /> Project No. S9200-06-94 -5- July 2010 <br /> 3 <br /> H <br /> I 1 <br />