Laserfiche WebLink
0 <br /> Since the proposedwelldestruction task do not include soil sampling or ground water monitoring, <br /> formal decontamination procedures are not required. Nevertheless,the SSO will arrange for sanitation <br /> and personal hygiene as outlined in section 4.2. ' <br /> 7.0 EMERGENCY RESPONSE PROCEDURES <br /> 7.1 Physicallnjury <br /> i <br /> In the event of an accident.resulting in physical injury, call emergency service personnel immediately i <br /> and perform first aid commensurate with training and seriousness of the injury. Severely injured <br /> personnel are to be transported only by emergency service personnel and/or by ambulance personnel, <br /> unless a life-threatening condition is judged toexistthat must be addressed immediaiely. <br /> 7.2 Catastrophic Event <br /> The Project Manager is to be notified by the SSO, as soon after the.injury as practical, regarding the <br /> nature of the accident. The Project Manager or designee will prepare written report within 24 hours of <br /> the accident. , <br /> In the event of a catastrophic,,event (e.g., severe personal injury, fire, explosion, and/or property <br /> damage),notify the fire/safety and rescue department immediately by dialing 911. <br /> Any accident involving serious injury, illness, or death will require suspension of site activities until ! <br /> the Project Manager (or designee) has completed a review of the events and site conditions and <br /> authorized work to resume. <br /> i <br /> Shop 10 MS,Task Order No.94 Caltrans Contract No.06A1 141,EA 43-910076 <br /> Project No. S920M6-94 -14- July 2010 <br />