My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1603
>
3500 - Local Oversight Program
>
PR0543430
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 11:08:01 AM
Creation date
2/5/2019 9:38:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543430
PE
3528
FACILITY_ID
FA0009377
FACILITY_NAME
CAL TRANS MAINT SHOP 10
STREET_NUMBER
1603
Direction
S
STREET_NAME
B
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16918002
CURRENT_STATUS
02
SITE_LOCATION
1603 S B ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.0 PROJECT PERSONNEL AND RELEVANT INFORMATION <br /> Questions about this project posed by neighbors, the press, or other interested parties should be directed to: <br /> Name: Terrence Fox Company: CALTRANS District 6 Phone: (559) 243-8317 <br /> The site phone number is a Regular Phone at in the Shop Maintenance Building = (209) 948-383.5 <br /> Site personnel shall be trained and certified in hazardous waste operations; specifically, <br /> • 40-Hour HAZWOPER Training and a current; <br /> • Annual 8-Hour Refresher[29 CFR 1910.120(e)(8)1; <br /> • First Aid/CPR training; and <br /> • Shall have had a physical examination consistent with 29 Code of Federal Regulations (CFR) 1910.120. <br /> (and 8 California Code of Regulations (CCR) 5192, if applicable.) <br /> In addition, the Site Manager/SHSO will have Supervisory 8-hour Training [29 CFR 1910.120(e)(4)}. <br /> Subcontractors shall review and sign the form in Attachment 12 ACKNOWLEDGMENT &AGREEMENT FORM <br /> The table below summarizes project personnel, responsibilities, and training dates. <br /> PROJECT JOB GENERAL PROJECT 40-Hr 8-Hr CPR/First MEDICAL <br /> TITLE NAME TELEPHONE NO. RESPONSIBILITIES HAZWOPER Refresher -Aid SURVEILANCE <br /> DATE <br /> (559)271-2650 Implementing this HASP. Has authority <br /> Site Health and Kimberly Wood Office to stop work. Perform air quality tasks. 8!2612005 3/3112009 21412008 6116!2009 <br /> Safety Officer (569)284-2160 Cell Take charge of all incidents. Review <br /> subcontractor HASP <br /> (925)299-9300x222 Implementing this HASP. Has authority <br /> Project Manager Mario Sternad Office to stop work. Perform air quality tasks. 41311993 1115!2009 10117/2007 7/21/2009 <br /> (925)260-7393 Cell Take charge of all incidents. Review <br /> subcontractor HASP - <br /> STANTEC Business (559)271-2660 Provide immediate support at notice of all <br /> Unit Leader Steve Strait Office incidents 2/4/1989 3131!2009 21412008 NIA <br /> STANTEC Director of (617)232-7366 Cell Respond with corporate resources to all <br /> Industrial Hygiene Philip Platcow (617)739-1224 incidents as appropriate. Assist in HASP 3/1/1997 113!2007 111212007 3119!2007 <br /> Home review.Assist in incident investigation. <br /> STANTEC Human (949)923-6061 Assist with incident review, <br /> Resources Director Peggy Ramos Office recordkeeping. NIA N/A NIA FNI <br /> STANTEC Consulting Corporation <br /> 9-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.