My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000190
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1603
>
3500 - Local Oversight Program
>
PR0543430
>
ARCHIVED REPORTS XR0000190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 10:57:02 AM
Creation date
2/5/2019 9:54:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000190
RECORD_ID
PR0543430
PE
3528
FACILITY_ID
FA0009377
FACILITY_NAME
CAL TRANS MAINT SHOP 10
STREET_NUMBER
1603
Direction
S
STREET_NAME
B
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16918002
CURRENT_STATUS
02
SITE_LOCATION
1603 S B ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Department of Transportation 000 <br /> P P February 24, 2 <br /> Shop 10 Maintenance Station, Stockton, California Project No 103872-02 <br /> 2. INTRODUCTION AND SCOPE OF SERVICES <br /> This report summarizes the results of the Fourth Quarter 1999 groundwater monitoring activities <br /> conducted January 4 and 5, 2000 at the Shop 10 Maintenance Station, located in Stockton, Cali- <br /> fornia (Figure 1) The work conducted by Ninyo & Moore was in accordance with Task Order <br /> No 10-911175-NB and Caltrans Contract No 43AO012 Our scope of services include 1) atten- <br /> dance of a prework site visit, 2) preparation of a site safety plan, 3) measurement of the depth to <br /> static groundwater at selected wells, 4) purging of a minimum of three well volumes to labeled <br /> reconditioned 55-gallon drums, 5) collection and chemical analysis of groundwater samples, and <br /> 6) preparation of this report documenting our field activities and findings <br /> 3. SITE BACKGROUND <br /> According to a report entitled, Revised Report, Third Quarter 1998 Groundwater Monitoring Re- <br /> ort by Professional Service Industries (PSI), dated March 19, 1999, four underground storage <br /> tanks (USTs) were removed from the site in August 1986 Subsequent to the removal, fourteen <br /> soil borings were drilled on-site and four were drilled off-site between 1987 and 1991 to deter- <br /> mine the extent of soil contamination Analytical results of soil samples collected indicated <br /> maximum concentrations of total petroleum hydrocarbons as gasoline (TPH-G) to be 3,800 mil- <br /> ligrams per kilogram (mg/kg) and total petroleum hydrocarbons as diesel (TPH-D) to be 4,500 <br /> mg/kg <br /> Between 1988 and 1991, five on-site and three off-site groundwater monitoring wells (MW-1 <br /> through MW-8) were installed These wells have been subsequently abandoned, and replaced by <br /> additional groundwater monitoring and/or vapor extraction wells (MW-9 through MW-26, VW- <br /> 1, VM-1, and VM-2) in 1990 In August 1998, wells VW-1 and MW-26 were abandoned The <br /> approximate locations of the remaining monitoring wells are shown in Figure 2 Quarterly <br /> groundwater monitoring has been conducted at the site in the wells since 1990 Historically, con- <br /> centrations of TPH-G, TPH-D, and benzene, toluene, ethylbenzene, and total xylenes (BTEX) <br /> • have been detected in the on-site monitoring wells <br /> shopi4dos z qj[![ff"&//�qm'Z T- <br />
The URL can be used to link to this page
Your browser does not support the video tag.