Laserfiche WebLink
California Department of Transportation June 7 1999 <br /> Shop 10 Maintenance Station, Stockton, California Project No 103872-02 <br /> ' trnmethylbenzene, 1,3,5-trimethylbenzene, chloroform, dichlorfluoromethane, isopropylbenzene, <br /> naphthalene, n-butylbenzene, and p-isopropyltoluene, sec-butylbenzene, tert-butylbenzene <br /> 1 6. RECOMMENDATIONS <br /> Based on the results of the First Quarter 1999 groundwater monitoring analytical results, which <br /> indicated elevated concentrations of TPH-g, TPH-d and/or BTEX, Ninyo & Moore recommends <br /> that quarterly groundwater monitoring continue at the site <br /> 7. LIMITATIONS <br />' The environmental services described in this report have been conducted in general accordance <br /> with current regulatory guidelines and the standard-of-care exercised by environmental consult- <br /> ants performing similar work in the project area No other warranty, expressed or implied, is <br /> made regarding the professional opinions presented in this report Please note that this portion of <br /> the study did not include an evaluation of geotechnical conditions or potential geologic hazards, <br /> which will be provided by Ninyo & Moore under a separate cover <br /> Our conclusions, recommendations and opinions are based on an analysis of the observed site <br /> conditions and the referenced literature It should be understood that the conditions of a site can <br /> change with time as a result of natural processes or the activities of man at the site or nearby <br /> sites In addition, changes to the applicable laws, regulations, codes, and standards of practice <br /> may occur due to government action or the broadening of knowledge The findings of this report <br /> 1 may, therefore, be invalidated over time, in part or in whole, by changes over which Ninyo & <br /> Moore has no control <br /> 1 This document is intended to be used only in its entirety Noortion of the document, b itself, is <br /> P Y <br /> designed to completely represent any aspect of the project described herein Ninyo & Moore <br /> should be contacted if the reader requires any additional information or has questions regarding <br /> Ithe content, interpretations presented, or completeness of this document <br /> shoPio 6 <br />