Laserfiche WebLink
1 <br />' APPENDIX A <br /> GROUNDWATER SAMPLING FIELD REPORT <br /> Project Name. CPI. 603 B Project No 1 02 g } a - 0 1 <br /> Monitoring Well ID: M w ` 10 DatePerformed- By �� L <br /> Depth to Water: 5. 9 Total Depth: -79 Measuring Point- 7M C <br /> Well Diameter Boring Lhameter• <br /> Well Volume- S{ Bonng Volume <br /> Muumum Purge Volume. 11 . 7 Purge Method U t'\ <br /> Pump Depth - -2-7, Pump Rate. 7_00 - I-" � Pum Size- <br /> Time Depth to Residual Percent <br /> Water (ft) Drawdown (ft) Recovery <br /> / 0 S , Qi _ / 6U <br /> Total Volume Purged l� GAL Time Finished Purging 1 <br /> Depth to Water After Purging o Maximum Drawdown <br /> 80% Recovery <br /> Time Analysis No. of Container Type Preservative <br /> y Containers and Size <br /> � M <br /> 1 Zo N z G s U4 k0 <br /> v0A-r No <br /> r Zo i� N 10 r1�3tt 1 AF�Am U;� k <br /> i <br /> Samples Collected By: tom— nAv" C- 1L <br />