Laserfiche WebLink
1APPENDIX A <br /> GROUNDWATER SAMPLING FIELD REPORT <br /> Project Name C,kLT1, J SS Z U 3 6 S`Mfg�r Project No : / % I a ! t - Q r _ <br /> Morutoring Well ID--—M w ' Z Date Performed: S—7 9 By. P D C <br /> Depth to Water: S Total Depth: Measunng Point. T-3 C _ <br /> Well aameter• Bonng Diameter b + <br /> Well Volume- D C Bonng Volume. <br /> Muumum Purge Volume: Z�4 , Z Purge Method- I? Vhf <br /> Pump Depth- "`_7 _ Pump Rate. -2 Pump Size- Z t kKH <br /> Time Depth to Residual Percent <br /> Water (ft) Drawdown (ft) Recovery <br /> Total Volume Purged �f G lca Time Finished Purgingi % 3� <br /> Depth to Water After Purging o Maximum Drawdown Lt r.,r <br /> 80% Recovery <br /> Time Analysis No. of Container Type Preservative <br /> Containers and Size <br /> Z Z G L va Iw <br /> m"- <br /> �!. G V Nb <br /> 2 43 - D lcstl I ISML r`tVYt, Alo <br /> Samples Collected By. Tm� A J AO C�k <br />