Laserfiche WebLink
i <br />' APPENDIX A <br /> GROUNDWATER SAMPLING FIELD REPORT <br /> Project Name � s Ibo 3 4.S p gj2Project No -... 10 2,4 l 8 - V I <br /> Morutonng Well IDM W - /3 _ Date Performed S /2- 0411 By; �D (, <br /> Depth to Water- - 7 Total Depth_`6 Measuring Point: C- <br />' Well Diameter- L Bonng Diameter- /0 r� <br /> Well Volume 6, Boring Volume <br /> IVluumum Purge Volume- ! 7 S Purge Method: P Ul`11� <br /> Pump Depth 0 Pump Rate- Zbn - Z 3-0 Pump Size <br /> Time Depth to Residual Percent <br /> Water (ft) Drawdown (ft) Recovery <br /> Total Volume Purged S � 6AL,, Time Finished Purging <br /> Depth to Water After Purging 0 Maximum Drawdown <br /> 80% Recovery <br /> Time Analysis No. of Container Type preservative <br /> Containers and Size <br /> S <br /> G�QML <br /> S l 2 S V U <br /> • <br /> Samples Collected By. �0 RN 1 r0 L <br />