My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000198
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1603
>
3500 - Local Oversight Program
>
PR0543430
>
ARCHIVED REPORTS XR0000198
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 11:12:55 AM
Creation date
2/5/2019 10:02:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000198
RECORD_ID
PR0543430
PE
3528
FACILITY_ID
FA0009377
FACILITY_NAME
CAL TRANS MAINT SHOP 10
STREET_NUMBER
1603
Direction
S
STREET_NAME
B
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16918002
CURRENT_STATUS
02
SITE_LOCATION
1603 S B ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment D <br /> NOTICE TO PROCEED <br /> Contract 53U495 <br /> Task Order 10-365101-01 <br /> This Notice to Proceed shall be issued to the Contractor by the Contract Manager upon the <br /> successful resolution of all concerns and issues relative to the completion of the work- <br /> described in this Task Order at the conclusion of the prework conference <br /> A <br /> The Contractor may not proceed with work under this Task Order until this Notice to <br /> Proceed has been signed by both the Contractor and the Contract Manager pursuant to the <br /> following statement <br /> STATEMENT BY THE CONTRACTOR OR THE CONTRACTOR'S DESIGNEE <br /> I have read and I understand the purpose,intent,terms and conditions of this Task Order <br /> and I have reviewed this Task Order with the Contract Manger. <br /> I have visited the work site with the Contract Manger. <br /> I will meet the delivery dates for key elements of the completion schedule, as may be <br /> revised,or pay the agreed to penalty. <br /> I understand that failure to comply with this Task Order will be grounds for withdrawal of <br /> the Task Order. , <br /> r <br /> Signature and Title of the Contractor Date Signed <br /> (or his designee) <br /> STATEMENT BY THE CONTRACT MANAGER OR HIS DESIGNEE <br /> I have reviewed this Task Order with the above named Contractor or his designee and I <br /> have escorted the contractor or his designee on a prework site visit <br /> I understand that the Contractor fully intends to follow and comply wrath the terms of this <br /> Task Order <br /> Therefore, I hereby authorize the Contractor to proceed with the work described in this <br /> Task Order. <br /> Signature and Title of the Contract Manager Date Signed <br /> (or his designee) <br />
The URL can be used to link to this page
Your browser does not support the video tag.