Laserfiche WebLink
1 <br /> • Electrical schematic (commonly referred to as a "single line diagram") depicting electrical <br /> amperage loads, circuit designs for the VES and meter base/circuit breaker box construction <br /> details <br /> • Process and instrumentation diagram which depicts wells, manifold configuration, valves, <br /> sample ports, and process control and monitoring devices <br /> • Construction details for wellheads, trench cross-sections, concrete pad, fence post footings, <br /> security bollards and well manifold <br /> ' 7.4 Schedule <br /> A proposed time schedule for the design, permitting, construction and start-up of a vapor extraction <br /> ' system for the subject site is presented below The schedule assumes time frames for regulatory <br /> approvals, bid solicitations and PG&E lead time for the new utility services <br /> ' Activily Estimated Start Date Estimated Completion Date <br /> Corrective Action NA December 1996 <br /> ' Plan Approval <br /> Air Quality Permitting March 1997 March 1997 <br /> SMUD Service Applications March 1997 March 1997 <br /> Engineering Design April 1997 May 1997 <br /> ' Solicit Construction Bids May 1997 May 1997 <br /> ' System Construction June 1997 June 1997 <br /> ' System Operation June 1997 Through 1998 <br /> 1 <br /> ' Project No 58100-06-18A -1$- December 9, 1996 <br />