My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000209
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1603
>
3500 - Local Oversight Program
>
PR0543430
>
ARCHIVED REPORTS XR0000209
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 11:19:07 AM
Creation date
2/5/2019 10:39:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000209
RECORD_ID
PR0543430
PE
3528
FACILITY_ID
FA0009377
FACILITY_NAME
CAL TRANS MAINT SHOP 10
STREET_NUMBER
1603
Direction
S
STREET_NAME
B
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16918002
CURRENT_STATUS
02
SITE_LOCATION
1603 S B ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost 1 i . 1 <br /> Necessary Equipment DMLS VANE-PUMP BLADDER PUMP KABISTM <br /> Manpower &Services Passive Membrane Purge & Bader Micro-purge Sampler <br /> Equipment <br /> Pump/Sampler 367200 75400 73200 169500 <br /> Power Source 49500 49500 49500 000 <br /> Air Source 000 000 35000 000 <br /> Controller 000 169500 100000 000 <br /> 100 ft hose&reel 000 129500 129500 000 <br /> Davit/Delivery Crane/Winch 89500 32500 42500 6500 <br /> Decontamination Wash Station 26500 26500 26500 3500 <br /> Power Washer 23500 23500 23500 000 <br /> Purge Barrels($85 ea) 000 22500 8500 000 <br /> Field Chemistry Meters(4ea @ $225) 000 90000 90000 000 <br /> Manpower at$48 50/hr) Subtotalm* 726000 449400 579200 179500 <br /> Assemble/Prepare Sampler 29400 9700 9700 000 <br /> Set-up&Assemble Extra Equipment 9700 9700 9700 000 <br /> Purge Well 000 4850 6063 000 <br /> Obtain Sample 9700 4850 2290 1213 <br /> Process Sample 4850 1213 1213 606 <br /> Pull Sampling Equipment&Clean-up well site 9700 4850 4850 000 <br /> Decontaminate Sampling Device 19400 19400 14550 2425 <br /> Waste Disposal Costs I Subtotalm/ 727500 54563 393660 142440 <br /> Purge-water disposal 000 11330000 11110000 0 00 <br /> Total Cost $ 13,83700 $ 13,250 34 t $ 10,818601 $2,21940 <br /> t Costs are based on 10 4-inch-diameter wells, each 50 ft deep and having 25 foot of water <br /> Use a standard 3 borehole volumes for purging of the wells where necessary <br /> *Standard water disposal costs are figured at$110155 gallons <br /> Hourly Cost$48 501man-hr <br />
The URL can be used to link to this page
Your browser does not support the video tag.