Laserfiche WebLink
r <br /> 5. <br /> a <br /> Regional Water quality Control Board Woodward•Cfyd9Consuttants <br /> June 23, 1988 <br /> Page 3 <br /> ,r-•� Municipal , irrigation <br />' Resources within 112 mile ofthe acility. <br /> and domestic wells are all present <br /> private underground <br /> 9, Lac3tion of neaobAttachmentalkfornlacationrofnp ublic utility <br /> Lines; Refer t <br /> utility lines at the sLhe•siThere are no known septi: tanks in the <br /> immediate vicinity of <br /> 10) Distance to au acent buildlocatn is ionsnd tOfibuilaeingS. water r and rand nsewer <br /> Refer to Attachment 1 for <br /> lines. <br /> presently conducting a <br /> 11? Pro osed monitorin well locations. WCC itimize ljcation of <br /> soil gas survey at the site in order to aroximately six monitoring <br /> monitoring wells. We anticipate that app <br /> wells will be installed durinwill mathelikelyetakesplaceninplateon of <br /> the project. This <br /> st <br /> June, 1988. <br /> Please call if we can provide additional information. <br /> Yours very truly, <br /> VOODWARD-CLYDE CONSULTANTS <br /> 09 <br /> _. / •" , , <br /> wSki George A. feet Geologist <br /> Michael S. aonko Senior Pro3e <br /> Senior Project Geologist <br /> GF/smp f <br /> B720033B/COT <br /> Attachments: 1) Location Map i <br /> r'. 2) Building and Utility Locations <br /> 3) WCC November 2, 1987 Report <br /> E <br />