Laserfiche WebLink
Ya l F. <br /> augers. The exactwell communication <br /> diameter hw lowbe de erm arnicas <br /> locations wi3lOfestock-tonnPublic lWorks Dep <br /> tment <br /> with the City ro erty owners-and adjacent p P well <br /> soil samQling, ling and <br /> Procedures for drillin o, ment, and water sampling <br /> accordance with the technical <br /> installation and deter p requirements and <br /> analysis will be d licable prior to <br /> specifications and app a encies. <br /> guidelines of the regulatory g <br /> each boring <br /> drilling, each boreho�ch. Additionallye clears Y <br /> to a minimum depth of 4 feet <br /> a private utility sea hole <br /> will be "hand dug eter of this hand dug <br /> below grade. The diem <br /> will be at least 11 inches. <br /> lea will be collected at <br /> During drilling, soil samples <br /> stratigraphic <br /> at sig rade to borehole <br /> 5-foot intervals and 5 feet below g <br /> changes beginnso9l samples will be obtzined through <br /> termination. ler lined with three cleaanalysis, <br /> a split-spoon sampler sample, recovered for aluminum <br /> sample sleeves. ht with Teflon tap into an <br /> will be cealed airtight Placed immediately <br /> foil and plastic cap <br /> iced cooler• ler will be logged <br /> le from the Ramp stem (U5Cs) <br /> iJ4 tion <br /> The second same ist or soils <br /> using the Unified 'ualifiCedsgeologist ord screened <br /> in the field <br /> ythird sample will be <br /> engineer. cos ample W gas indicator with <br /> using a Gastechtor <br /> recorded on the boring <br /> the results of the screenleg will be retained for <br /> cis of physical properties <br /> selected soil s "iy draulic <br /> logs• analy and by <br /> possible laboratory <br /> content. <br /> including density, ervil o material <br /> lbes <br /> If rock or imp <br /> conductivity during drillings the boring <br /> encountered that depth. <br /> terminated at <br /> We will be constructed a <br /> The screened intervel <br /> The onsite MonitoringPVCasing• allow entry of <br /> 4-inch--diameter PVC length to t <br /> Of sufficient leng odate any seasonal <br /> shall be roducts and accamm occur based <br /> petroleum P changes which may The filter <br /> We at the site. <br /> water level will b <br /> existing monitoring a determined in the f <br /> udgement of the <br /> pack and screen slot sineering j Well shall be <br /> field based on the engineering <br /> each <br /> ersonnel. The top and locking water <br /> tzght <br /> field p lacking cap.. <br /> secured with with the ground surface• <br /> boxes finished <br /> t <br /> 6 <br />