My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000223
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1603
>
3500 - Local Oversight Program
>
PR0543430
>
ARCHIVED REPORTS XR0000223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 11:30:22 AM
Creation date
2/5/2019 11:08:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000223
RECORD_ID
PR0543430
PE
3528
FACILITY_ID
FA0009377
FACILITY_NAME
CAL TRANS MAINT SHOP 10
STREET_NUMBER
1603
Direction
S
STREET_NAME
B
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16918002
CURRENT_STATUS
02
SITE_LOCATION
1603 S B ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Department of Transportation March 13, 2001 <br /> Shop 10 Maintenance Station, Stockton, California Project No 400296-01 <br /> • <br /> 2 INTRODUCTION AND SCOPE OF SERVICES <br /> This report summarizes the results of the Third Quarter 2000 groundwater monitoring activities <br /> conducted September 13, 2000 at the Shop 10 Maintenance Station, located in Stockton, Califor- <br /> nia (Figure 1) The work conducted by Ninyo & Moore was in accordance with Task Order No <br /> 10-987901-NP and Caltrans Contract No 43AO012 Our scope of services include 1) attendance <br /> of a prework site visit, 2) preparation of a site safety plan, 3) measurement of the depth to static <br /> groundwater at selected wells, 4) purging of a minimum of three well volumes to labeled recon- <br /> ditioned 55-gallon drums, 5) collection and chemical analysis of groundwater samples, and 6) <br /> preparation of this report documenting our field activities and findings <br /> 3 SITE BACKGROUND <br /> According to a report entitled, Revised Report, Third Quarter 1998 Ground«ater Monitoring Re- <br /> II port by Professional Service Industries (PSI), dated March 19, 1999, four underground storage <br /> tanks (USTs) were removed from the site in August 1986 Subsequent to the removal, fourteen <br /> Isoil borings were drilled on-site and four were drilled off-site between 1987 and 1991 to deter- <br /> mine the extent of soil contamination Analytical results of soil samples collected indicated <br /> Imaximum concentrations of total petroleum hydrocarbons as gasoline (TPH-G) to be 3,800 mil- <br /> ligrams per kilogram (mg/kg) and total petroleum hydrocarbons as diesel (TPH-D) to be 4,500 <br /> Img/kg <br /> Groundwater monitoring wells currently active and sampled during quarterly groundwater <br /> monitoring for the site include MW-9, MW-11, MW-12, MW-13, MW-14, MW-16, MW-19, <br /> MW-20, MW-24, MW-25 and VM-1 Monitoring well VM-2 is normally sampled, however it <br /> has been buried and paved over since the last time it was sampled during the third quarter 1999 <br /> monitoring event Since 1988 several wells were installed and subsequently abandoned including <br /> MW-1, MW-2, MW-3, MW-4, MW-5, MW-7, MW-8, MW-10, MW-26 and VW-1 The ap- <br /> proximate locations of the active monitoring wells are shown in Figure 2 Quarterly groundwater <br /> Imonitoring has been conducted at the site in the wells since 1990 Historically, concentrations of <br /> • <br /> I <br /> I0290 01r shop]0 FV L 3Q2000 doc 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.