My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1604
>
3500 - Local Oversight Program
>
PR0543431
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 12:04:16 PM
Creation date
2/5/2019 11:49:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543431
PE
3528
FACILITY_ID
FA0003683
FACILITY_NAME
Caltrans-Stockton
STREET_NUMBER
1604
Direction
S
STREET_NAME
B
STREET_TYPE
St
City
Stockton
Zip
95206
APN
171-090-08
CURRENT_STATUS
02
SITE_LOCATION
1604 S B St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Well Destruction Activities <br /> Groundwater monitoring wells MW-7, MW-8 and MW-9 will be destroyed by pressure grouting the <br /> casing and annulus to the total depth of each well. The sealing material will consist of neat cement <br /> with a 5% mixture of bentonite. The cement will be introduced with a tremie pipe extending to the <br /> bottom of each monitoring well:The three wells are 4-inch-diameter wells and range in depth from 74 <br /> to 79 feet. After the wells are grouted to a depth of approximately 3 feet below the ground surface, we <br /> will utilize a backhoe to remove the upper three feet of casing and the soil from an area 12 inches <br /> larger than the original 10-inch borehole. Once the soil has been removed, additional grout will be <br /> added to the casing and allowed to "mushroom" over the casing and into the surrounding three-foot- <br /> deep excavation. The excavation will then be backfilled with concrete to the ground surface. Black dye <br /> w' applied to the concrete at the ground surface in order to blend with the surrounding asphalt. <br /> 111 app e gr g p <br /> The excavated soil will be contained in labeled Department of Transportation-approved, 55-gallon <br /> drums and stored temporarily onsite until transportation to an appropriate disposal facility can be <br /> arranged. The three-foot sections of well casing will be placed in a waste receptacle. <br /> Report Preparation <br /> A Well Installation and Well Destruction Report will be prepared to transmit the field data. The <br /> Report will include(but.not be limited to)the following: <br /> Background summary, <br /> Scope of services performed, <br /> Observations during the field activities, <br /> Results of field activities, <br /> Confirmation numbers for GeoTracker submittals, <br /> - Vicinity Map and Site Plan indicating new and former well locations,and <br /> - Appendices including regulatory permits,boring/well logs and well survey data. <br /> Caltrans will be provided with a draft report, and upon receipt and incorporation of Caltrans' <br /> comments,we will provide three hard copies and one electronic (CD)copy of the finalized report. <br /> Stockton Yard Maintenance Station,Task Order No.45 Caltrans Contract 06A1141,EA 10-ON8300 <br /> Project No.59200-06-45 -4 - June 26,2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.