Laserfiche WebLink
i <br /> (( ''Caltrans Stockton Yard. <br /> 1604 South B Street <br /> Stockton California <br /> Project Plans for Construction <br /> Construction Costs <br /> Unit Costs <br /> Item No. Description Quanity Unit (dollars) Total <br /> Electrical Equipment(parts,labor,installation,and <br /> underground utility locator service) (as shown and <br /> specified) 1 is 12,600.00 12,600.00 <br /> Equipment Slab including concrete,rebar,aggregate <br /> base,j-bolts,preparation and installation(as shown <br /> and specified) 20 m 225:00 4,500.00 <br /> Catalytic Oxidizer (as shown and specified) 1 ea 40,000.00 40,000.00 <br /> Air Sparge Compressor(Supplied by owner) n/a n/a - _ <br /> Heat Reducing Piping including ABS Piping, <br /> unions,gages,copper piping brass couplings;steel <br /> pipe,and labor to install.(as shown and specified)-. 1 is . 1,200.00 1,200:00 <br /> Remediation wells including drilling new wells and <br /> retrofitting existing wells,supervision. (as shown and <br /> specified) 1 is 22,000.00_ 22,000.00: <br /> Well Heads (as shown and specified) 8 ea 500.00 4,000.00 <br /> Vapor Extraction System and Air Sparge System <br /> Manifolds (as shown and specified) 1 is 3,000.00 3,000.00 <br /> Catalytic Oxidizer Inlet Piping (as shown and <br /> specified) 1 is 1,350.00 1,350.00 <br /> Manifold Support and anchors (as shown and <br /> specified) 1 is 750.00 750.00 <br /> Pipe Trenching to equipment including saw <br /> cutting,backfill,piping and repaving. (as shown and <br /> specified) 400 ft 1. 43.50 1 1734.00.00 <br /> Total Estimated Cost $106,800 <br />