My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1604
>
3500 - Local Oversight Program
>
PR0543431
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 12:04:16 PM
Creation date
2/5/2019 11:49:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543431
PE
3528
FACILITY_ID
FA0003683
FACILITY_NAME
Caltrans-Stockton
STREET_NUMBER
1604
Direction
S
STREET_NAME
B
STREET_TYPE
St
City
Stockton
Zip
95206
APN
171-090-08
CURRENT_STATUS
02
SITE_LOCATION
1604 S B St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> (( ''Caltrans Stockton Yard. <br /> 1604 South B Street <br /> Stockton California <br /> Project Plans for Construction <br /> Construction Costs <br /> Unit Costs <br /> Item No. Description Quanity Unit (dollars) Total <br /> Electrical Equipment(parts,labor,installation,and <br /> underground utility locator service) (as shown and <br /> specified) 1 is 12,600.00 12,600.00 <br /> Equipment Slab including concrete,rebar,aggregate <br /> base,j-bolts,preparation and installation(as shown <br /> and specified) 20 m 225:00 4,500.00 <br /> Catalytic Oxidizer (as shown and specified) 1 ea 40,000.00 40,000.00 <br /> Air Sparge Compressor(Supplied by owner) n/a n/a - _ <br /> Heat Reducing Piping including ABS Piping, <br /> unions,gages,copper piping brass couplings;steel <br /> pipe,and labor to install.(as shown and specified)-. 1 is . 1,200.00 1,200:00 <br /> Remediation wells including drilling new wells and <br /> retrofitting existing wells,supervision. (as shown and <br /> specified) 1 is 22,000.00_ 22,000.00: <br /> Well Heads (as shown and specified) 8 ea 500.00 4,000.00 <br /> Vapor Extraction System and Air Sparge System <br /> Manifolds (as shown and specified) 1 is 3,000.00 3,000.00 <br /> Catalytic Oxidizer Inlet Piping (as shown and <br /> specified) 1 is 1,350.00 1,350.00 <br /> Manifold Support and anchors (as shown and <br /> specified) 1 is 750.00 750.00 <br /> Pipe Trenching to equipment including saw <br /> cutting,backfill,piping and repaving. (as shown and <br /> specified) 400 ft 1. 43.50 1 1734.00.00 <br /> Total Estimated Cost $106,800 <br />
The URL can be used to link to this page
Your browser does not support the video tag.