Laserfiche WebLink
f 4` <br /> j <br /> REPORT OF FINDINGS <br /> An. Air-Sparge and Soil Vapor Extraction System'installation Report will be prepared following <br /> installation and start-up testing of the AS/SVE system. The report will include (but not be limited to) <br /> the following: <br /> • Project description <br /> 0 Introduction <br /> • Investigative methods <br /> • Field observations <br /> I <br /> • Start-up testing results <br /> • Analytical data evaluation and discussion <br /> • Conclusions and recommendations j <br /> • Vicinity Map and Site Plans depicting AS,SVE and monitoring well locations <br /> • Appendices including boring logs,permits,laboratory reports and chain-of-custody <br /> documentation. II <br /> I <br /> Please contact us if you have any questions concerning this RAW or if we may be of further service. <br /> Sincerely, �y�ONAL Glc <br /> ¢ KE 141 , <br /> GEOCON CONSULTANTS,INC. BROWN � <br /> ti Naiot i <br /> Josh Ewert. evi rown,PG Re L. Silva,REA <br /> Senior Staff Geologist Senior G ologist Project Manager <br /> (2) Addressee <br /> ' Attachments: Figure 1,Vicinity Map <br /> Figure 2, Site Plan <br /> Figure 3,Cross Section A-A' <br /> Figure 4, Cross Section B-B' <br /> Figure 5,AS Manifold,Trench,&Well Construction Detail <br /> Figure 6,SVE Manifold,Trench&Well Construction Detail <br /> Figure 7,AS/SVE System Schematic <br /> Figure,8,Proposed Remediation System Map <br /> li Table 1,Well Construction Details <br /> Table 2, Summary of Groundwater Elevation and Analytical Data <br /> Table 3, Summary of Groundwater Analytical Data—RNA Parameters <br /> E.i <br /> 1 <br /> Stockton Maintenance Station,Task Order No.05 Caltrans Contract No.06A1141,EA 10-ON8300 <br /> fProject No.S9200-06-05A _ 10- December 28,2010 <br /> �i <br /> 1 _ a <br />