ameO <br /> The boring locations may be adjusted in the field based on MIP results or to accommodate <br /> surface obstructions. <br /> 3.3.1 Drilling Methodology <br /> A CPT rig equipped with a MIP will be used to obtain lithologic data, determine the presence of <br /> groundwater, and obtain vertical petroleum hydrocarbon concentration profiling data. The <br /> CPT borings will be conducted using a piezocone that is pushed into the soil using a hydraulic <br /> system connected by stainless steel rods. The piezocone records friction, tip resistance, and <br /> pore pressure which is used to evaluate soil types. The CPTs will be performed in accordance <br /> with American Society for Testing and Materials(ASTM) standard D5778-95, revised in 2002. <br /> The CPT will provide detailed stratigraphic logging with contaminant screening. The MIP is a <br /> module that can fit behind the standard CPT piezocone and is pushed into the ground one foot <br /> at a time where it acts as an interface between the contaminant in the subsurface and gas <br /> phase detectors at the surface. As it is pushed into the cool ground, the heated probe cools. <br /> At each foot interval, the probe is allowed to heat back up in order to optimize its ability to <br /> volatilize chemical constituents with which it comes in contact. A clean carrier gas passes <br /> behind the membrane, causing diffusion across the membrane, and transporting volatile <br /> organic to the surface where they are monitored by gas phase detectors. The detectors can <br /> measure hydrocarbons that are present in soil and groundwater. Near real-time <br /> measurements of volatile organic compound (VOC)and petroleum hydrocarbons can be <br /> achieved and a continuous response profile log is recorded for the borehole. <br /> 3.3.3 Grab Groundwater Sampling <br /> To supplement the MIP results, one groundwater grab sample will be collected from each soil <br /> boring CPT-1 through CPT-4 by setting temporary wells installed at each boring location. The <br /> first encountered groundwater samples will be obtained using a new disposable polyethylene <br /> bailer with a bottom emptying device. After the collection of the groundwater sample, water <br /> quality parameters will be measured from the sampling interval. Water quality parameters to <br /> be measured include pH, electrical conductivity (eC), dissolved oxygen (DO), oxidation <br /> reduction potential (ORP), and temperature. Grab groundwater samples will be analyzed for <br /> the following constituents as shown in Table 1. <br /> • TPHg by United States Environmental Protect Agency(U.S. EPA) Method 8015M; <br /> • TPHd by U.S. EPA Method 8015M; and <br /> • BTEX, fuel oxygenates compounds (Di-isopropyl ether, Ethyl tert-butyl ether, Tert- <br /> amyl methyl ether, Tert-Butanol, Methyl tert-butyl ether), and lead scavengers <br /> (1,2-Dibromoethane and 1,2-Dichloroethane) by U.S. EPA Method 8260B. <br /> AMEC Geomatrix, Inc. <br /> P:\Project\14000s\14443_Callrans\TO 10\11000_PLANS\AS WP—March 2010WS WP.doc 7 <br /> u <br />