My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1049
>
2200 - Hazardous Waste Program
>
PR0514078
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 1:23:48 PM
Creation date
2/5/2019 12:07:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0514078
PE
2228
FACILITY_ID
FA0003509
FACILITY_NAME
LKQ ACME TRUCK PARTS
STREET_NUMBER
1049
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15133403
CURRENT_STATUS
01
SITE_LOCATION
1049 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2228_PR0514078_1049 S WILSON_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HAZARDOUS WASTE CON,,,INGENCYPLAN <br />For, use,by Unidocs Member Agencies or where approved.by your Local Jurisdiction <br />Authority Cited: Tittle 22; California Code ofRegulations (CCR) §6626S.52 as referenced by§66262,34(a)(4) or 6700 3(c)(9)(C) <br />Facilities that generate 1,000 kilograms .or more of hazardous waste per month, or accumulate more than 6,000 <br />kilograms of hazardous waste on-site at any one-time, must prepare a Contingency Plan. Facilities that generate <br />in any month more than 1 kilogram of acutelyhazardous waste (AHW, ), or more; than 100 kilograms of debris <br />resulting from the spill of an AHW, or. which treat hazardous waste onsite undor the Permit `by Rule (PDR). <br />onsite treatment tier must also prepare a Contingency Plan. Many facilities 'that are ,required to prepare a <br />Contingency Plan are already subject to Hazardous Materials Business Plan (MMP) reporting requirements <br />due to the quantities of hazardous materials/wastes they have onsite. If you have already prepared a Undoes <br />HM BP, or already have a plan which is equivalent in content to the: Emerggggy Resuonse/Cointingency. Plan <br />module of the Unidocs HMBP you have satisfied the Contingency Plan requirements, and are not required to <br />complete the blank plan, below. <br />This site-specific Contingency Plan is the facility's plan for dealing with emergencies and shall be implemented <br />immediately whenever there is an imminent or actual fire, explosion; or release of hazardous waste or a <br />hazardous waste constituent which could threaten human health,and/or the environment. At -least one copy. of <br />the plan shall be maintained at the facility for use in the event of an emergency and for inspection by the <br />local agency. A copy of the plan and any revisions must be provided to any contractor, hospital, or agency <br />with whom special (i.e. contractual) emergency services arrangements have been made (see Section E, below), <br />A. Facility Information: <br />BUSINEss NANM L Q ACME TRUCK PARTS., BUSINESS PHON E. <br />a. <br />SrrE A7SDRES.s R CITY ' ZIP CODE <br />tNZ.sr i. Li , Cno`Y Ste„o ad <br />B. Emergency Coordinators: <br />All personnel qualified to act as the facility's Emergency Coordinator must be listed in this plan. (Note., <br />Emergency Coordinator responsibilities are described- in Section F, below) If snore than two people are <br />qualified, list the names, titles, business and 24-hour telephone numbers, and pager numbers of the additional <br />qualified individuals onanattached page in the order in which they will assume responsibility as alternates, <br />then check the box beneath the Emergency Coordinator information -table, below, and indicate the list's page <br />number in the space provided. <br />M1. C'N el 'I). h pt"r <br />rnuNE <br />--15bl <br />❑ (Check box only if applicable):Additional Emergency Coordinators are listed on page of this plan. <br />C. Evacuation Plan: <br />1. The following alarm signal(s) will be used to begin evacuation of the "facility (check all that apply); <br />Bells; ❑ Horns/Sirens;gVerbal (i.e , shouting); Dther(specifl <br />c <br />UN-017 -1/6 <br />www.un[4ocs.org Rev. 03/27/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.