My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1049
>
2200 - Hazardous Waste Program
>
PR0514078
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 1:23:48 PM
Creation date
2/5/2019 12:07:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0514078
PE
2228
FACILITY_ID
FA0003509
FACILITY_NAME
LKQ ACME TRUCK PARTS
STREET_NUMBER
1049
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15133403
CURRENT_STATUS
01
SITE_LOCATION
1049 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2228_PR0514078_1049 S WILSON_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. 'Ms. <br />0 0 <br />VISUAL INSPECTION OF INTERIOR: No Failure as of July 15 2011 <br />TANK PARAMETERS ON INSPECTION: No leakage Between Walls <br />SECONDARY CONTAINMENT: Double Wall Tank With Dipstick Checked Weekly <br />CONTAINMENT VOLUME 135% of Capacity <br />CONTAINMENT CONDITIONS: Very Good <br />TANK INTEGRITY TEST: A visual inspection of all area of this double wall tank showed no signs of over flow <br />or leakage. No leaks in piping were found under 5 psi pressure. <br />TEST PROCEDURE: All vents and tank outlets where removed and pugged to be air tight for pressure test <br />Air pressure to 5 psi was applied thru a Schroder valve. <br />LEAKS: Air pressure in the tank dropped by .2 lbs. in the first 10 min. of the test. <br />Soap solution was applied and the leak found at a plug. Plug tightend, leak stoped <br />RETURN TANK TO SERVICE: Re -install vents and vacuum extraction outlet and resume use. <br />EQUIPMENT: Plugs, Caps, and a Pressure Gauge to 15 psi <br />TIME PRESSURE TEMP. DEG. F NOTES <br />09:30 AM 0.0 69.0 START SLOW PRESSURE BUILD <br />09:45 AM 5.0 70.0 AIR LEAK AT PLUG <br />10:00 AM 5.0 70.0 <br />10:15 AM 5.0 70.0 <br />10:30 AM 5.0 70.0 <br />10:45 AM 5.0 71.0 <br />TEST COMPLETED: 10:45 AM 5.0 71.0 <br />NO LEAKS NO TANK FRACTURES <br />TEST COMPLETE <br />PRESSURE ON BOTTOM OF TANK WITH V OF PRODUCT AND 5.0 PSI AIR PRESSURE 6.4 PSI <br />TANK FILL PIPING AND FEED PUMP All tank piping and used antifreeze pump were tested under 5 psi along with the tank <br />at the same time as the let piping was not capped or plugged. No leaks were found <br />in piping to the tank or the pump. <br />OPERATION OF TANK AND EQUIP: Acme Truck Parts and Equipment, Inc is open for business 40 hours per week. <br />OFF HOURS PROTECTION After hours the site is protected by a 8' chain link fence toped with razor wire and <br />AND SECURITY perimeter alarm system. <br />Ethylene Glycol <br />Diethylene Glycol <br />THIS REPOT <br />SIGNED: <br />1673111110AZW <br />80 to 96 percent of total <br />0 to 8 percent of total <br />=_ 19752 <br />
The URL can be used to link to this page
Your browser does not support the video tag.