My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1049
>
2200 - Hazardous Waste Program
>
PR0514078
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 1:23:48 PM
Creation date
2/5/2019 12:07:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0514078
PE
2228
FACILITY_ID
FA0003509
FACILITY_NAME
LKQ ACME TRUCK PARTS
STREET_NUMBER
1049
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15133403
CURRENT_STATUS
01
SITE_LOCATION
1049 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2228_PR0514078_1049 S WILSON_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ZA OUS WASTE CONTINGENCY PLAN <br />For use by Unidocs Member Agencies or where approved by your Local Jurisdiction <br />Authority Cited: Title 22, California Code of Regulations (CCR) §66265.52 as referenced by §66262.34(a)(4) or 67450.3(c)(9)(C) <br />Facilities that generate 1,000 kilograms or more of hazardous waste per month, or accumulate more than 6,000 <br />kilograms of hazardous waste on-site at any one time, must prepare a Contingency Plan. Facilities that generate <br />in any month more than 1 kilogram of acutely hazardous waste (AHW), or more than 100 kilograms of debris <br />resulting from the spill of an AHW, or. which treat hazardous waste onsite under the Permit by Rule (PBR) <br />onsite treatment tier must also prepare a Contingency Plan. Many facilities that are required to prepare a <br />Contingency Plan are already subject to Hazardous Materials Business Plan (HMBP) reporting requirements <br />due to the quantities of hazardous materials/wastes they have onsite. If you have already nre arp ed a Unidocs <br />This site-specific Contingency Plan is the facility's plan for dealing with emergencies and shall be implemented <br />immediately whenever there is an imminent or actual fire, explosion, or release of hazardous waste or a <br />hazardous waste constituent which could threaten human health and/or the environment. At least one copy of <br />the plan shall be maintained at the facility for use in the event of an emergency and for inspection by the <br />local'. agency. A copy of the plan and any revisions must be provided to any contractor, hospital, or agency <br />with whom special (i.e. contractual) emergency services arrangements have been made (see Section E, below). <br />A. Facility Information: <br />BUS ESS NAME BUSINESS PHONE. <br />CM L uucic -3 o '#VC_ OX I <br />SITE ADDRESS R CITY I ZIP CODE <br />q2 =1Z W W , <br />B. Emergency Coordinators: <br />All personnel qualified to act as the facility's Emergency Coordinator must be listed in this plan. (Note: <br />Emergency Coordinator responsibilities are described in Section F, below.) If more than two people are <br />qualified, list the names, titles, business and 24-hour telephone numbers, and pager numbers of the additional <br />qualified individuals on an attached page in the order in which they will assume responsibility as alternates, <br />then check the box beneath the Emergency Coordinator information table, below, and indicate the list's page <br />number in the space provided. <br />Prima EmeMency Coordinator <br />Second= EmerLency Coordinator <br />NAME� <br />NAMEUAIHAV :�70 <br />TITLE v <br />o r wt u.v <br />TITLE <br />e ova �}L, <br />BUSINESS PHONE 1*3 <br />—-s <br />BUSINESS PHONE <br />24-HOUR PHONE <br />24-HOUR PHONE <br />T <br />Oolb 1? 93— /s60 <br />PAGER # <br />PAGER # <br />❑ (Check box only i(applicable) Additional Emergency Coordinators are listed on page of this plan. <br />C. Evacuation Plan: <br />1. The following alarm signal(s) will be used to begin evacuation of the facility (check all that apply): <br />❑ Bells; ❑ Horns/Sirens; [Verbal (i.e., shouting); [Other (sped i�QX i �7G3ti2-S <br />UN -017-1/6 www.unidocs.org Rev. 03/27/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.