Laserfiche WebLink
7, <br /> 2 <br /> FLUID MEASUREMENT FIELD DATA <br /> [SHEET: 1 OF 1 <br /> DATE: 17 q7_ -UV-� PROJECT NAME: Stockton Maintenance Station PROJECT NO: 575-8G013 <br /> WATER LEVEL MEASUREMENT INSTRUMENT: Solinst Groundwater/product Interface Probe <br /> PRODUCT DETECTION INSTRUMENT: Solinst Groundwater/product Interface Probe <br /> EQUIP. RECON: ALCONOX WASH ❑DISTIDEION I RINSE [-] ISOPROPANOL El ANALYTE FREE FINAL RINSE El TAP WATER FINAL RINSE <br /> f-1 TAP WATER WASH E] LIQUINOX WASH DISTIDEION 2 RINSE El OTHER SOLVENT ❑ DIST/DEION FINAL RINSE ❑ AIR DRY <br /> WELL GROUND TOP OF DEPTH TO DEPTH TO WELL PRODUCT WATER ACTUAL <br /> NUMBER SURFACE CASING PRODUCT WATER DEPTH THICKNESS TABLE TIME <br /> ELEVATION ELEVATION BELOW TOC BELOW TOC BELOW TOC ELEVATION <br /> MW-1 XXXXXXX 21.49 xxxxxxx 100 XXXXXXXX q 9 <br /> MW-2 xxxxxxx 21.71 XXXXXXX 76.5 xxxxxxxx 47 <br /> MW-3 xxxxxxx 21.41 xxxxxxx W- 66.6 xxxxxxxx - 01 <br /> MW-4 Xxxxxxx 21.63 Xxxxxxx il'I.6t 75 xxxxxxxx <br /> MW-5 xxxxxxx 21.56 xxxxxxx 77.5 xxxxxxxx 0 <br /> MW-6 xxxxxxx 20.92 xxxxxxx L4 86-5 Xxxxxxxx <br /> MW-7 XXXXXXX 21.27 xxxxxxx <br /> 1-3) 71.50 xxxxxxxx <br /> 07 <br /> MW-8 XXXXXXX 21.48 XXXXXXX 78.4 XXXXXXXX 7 12 j� <br /> MW-9 xxxxxxx 20.43 xxxxxxx qq',&4 Ll 89.6 XXXXXXXX 10 <br /> MW-10 xxxxxxx 21.44 xxxxxxx 90.9 xxxxxxxx <br /> MW-11 xxxxxxx 21.13 xxxxxxx 14 88 xxxxxxxx 1:7 11 <br /> cr <br /> MVV-12 xxxxxxx 22.19 XX;K)CXXX 76 xxxxxxxx 0 <br /> VW-1 xxxxxxx 21.73 XXXXXXX 75 xxxxxxxx j <br /> VW-2 Xxxxxxx 21.9 xxxxxxx 60 xxxxxxxx <br /> iy <br /> PREPARED BY: M.McKenzie <br />