Laserfiche WebLink
WELL PURGING AND SAMPLING DATA <br /> WELL NO <br /> ' DATE PROJECT NAME STOCKTON YARD PROJECT NO 575--Re1 -gGg3 <br /> WEATHER CONDITIONS <br /> ' WELL DIAMETER(IN) ❑ 1 ❑ 2 04 ❑ S ❑OTHER <br /> SAMPLE TYPE EGROUNDWATER ❑WASTEWATER ❑SURFACE WATER ❑OTHER <br /> F DEPTH TO WATER BEFOREBEFOREPURGING S3, Z F1 <br /> WELL DEPTH(TOC) --9-1 <br /> LENGTH OF WATER 3Li `-g-s CALCULATED 3 WELL VOLUMES C4q, GAL <br /> ' PURGING DEVICE Grundfos pump ❑ DEDICATED ❑ DISPOSABLE DECONTAMINATED <br /> SAMPLING DEVICE ❑ DEDICATED DISPOSABLE ❑DECONTAMINATED <br /> EQUIP DECON ❑TAP WATER WASH []ISOPROPANOL ❑ANALYTE FREE FINAL RINSE <br /> ALCONOX WASH DISTIDEION I RINSE ❑OTHER SOLVENT ❑ DISTIDEION FINAL RINSE <br /> ' LIQUINOX WASH DIST/DEION 2 RINSE ❑TAP WATER FINAL RINSE ❑AIR DRY <br /> CONTAINER PRESERVATION E LAB PRESERVED ❑FIELD PRESERVED <br /> WATER ANALYZER MODEL&SERIAL NO <br /> ' ACTUAL CUMUL TEMP SPECIFIC pH DISS TURBIDITY WATER REMARKS <br /> TIME VOLUME E°F CONDUCT OXYGEN (NTUs) APPEAR (EVIDENT ODOR COLOR PID) <br /> (MIN) PURGED I]°C CL=CLEAR <br /> (GAL) CO"CLOUDY <br /> TU-TURBID <br /> INITIAL <br /> 1 <br /> 1 <br /> DEPTH TO WATER AFTER PURGING(TOC) 53, (3(o FT SAMPLE FILTERED ❑YES ❑NO SIZE <br /> NOTES SAMPLE TIME 3',T5 ID# <br /> DUPLICATE ❑ TIME ID# <br /> ' EQUIP BLANK ❑ TIME ID# <br /> PREPARED BY CHRIS MERRITT <br /> • 'A 1 FOOT LENGTH OF WATER=0 05 GAL IN 1"DIA PIPE 0 17 GAL IN 2"DIA PIPE 0 65 GAL IN 4"DIA PIPE 1 5 GAL IN 8"DIA PIP <br /> 1 <br />