My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000255
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1604
>
3500 - Local Oversight Program
>
PR0543431
>
ARCHIVED REPORTS XR0000255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 2:31:33 PM
Creation date
2/5/2019 1:24:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000255
RECORD_ID
PR0543431
PE
3528
FACILITY_ID
FA0003683
FACILITY_NAME
Caltrans-Stockton
STREET_NUMBER
1604
Direction
S
STREET_NAME
B
STREET_TYPE
St
City
Stockton
Zip
95206
APN
171-090-08
CURRENT_STATUS
02
SITE_LOCATION
1604 S B St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(.aiaorma Deparinle+il Lit ii an�,pur ia.1Ji. 1J, <br /> Stockton Maintenance Station, Stockton, California Project No 400296-01 <br /> 2 INTRODUCTION AND SCOPE OF SERVICES <br /> This report summarizes the results of the Third Quarter 2000 groundwater monitoring activities <br /> conducted on September 13, 2000 at the Stockton Maintenance Station, located in Stockton, <br /> California (Figure 1) The work conducted by Ninyo & Moore was in accordance with Task Or- <br /> der No 10-987901-NP and Caltrans Contract No 43AO012 Our scope of services include 1) <br /> attendance of a prework site visit, 2) preparation of a site safety plan, 3) measurement of the <br /> depth to static groundwater at selected wells, 4) purging of a minimum of three well volumes to <br /> labeled reconditioned 55-gallon drums, 5) collection and chemical analysis of groundwater sam- <br /> ples, and 6) preparation of this report documenting our field activities and findings <br /> 3 SITE BACKGROUND <br /> According to a report entitled, Final Report, Fourth Quarter 1998 Groundwater Monitorm Re- <br /> port by Professional Service Industries (PSI), dated February 19, 1999, one 5,000-gallon diesel <br /> underground storage tank (UST) and one 10,000-gallon unleaded gasoline UST, two pump is- <br /> lands and associated product piping were removed from the site in 1989 Subsequent to the <br /> removal, soil samples were collected to determine the extent of soil contamination Analytical <br /> results of soil samples collected indicated maximum concentrations of total petroleum hydrocar- <br /> bons as gasoline (TPH-G) to be 2,000 milligrams per kilogram (mg/kg) and total petroleum <br /> hydrocarbons as diesel (TPH-D) to be 58 mg/kg <br /> Twelve groundwater monitoring wells and two vapor extraction wells have been installed at the <br /> site The approximate locations of the monitoring and vapor extraction wells are shown in Figure <br /> 2 Quarterly groundwater monitoring has been conducted at the site on wells MW-1, MW-2, and <br /> MW-3 since April 1992 Wells MW-4 through MW-8 and VW-I have been monitored since May <br /> 1995 Wells MW-9 through MW-12 and VW-2 have been monitored since February 1996 His- <br /> torically, high concentrations of TPH-G, TPH-D, and benzene, toluene, eth�lbenzene, and total <br /> xylenes (BTEX) have been detected in the on-site monitoring wells <br /> • <br /> 0290 01 r St,ckton Fzil 3Q2000 doc 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.