Laserfiche WebLink
GROUNDWATER SAMPLING FIELD REPORT <br /> Project Name - L A 1 YaN s A� d � 9 Project No •.„J 6 Z �s i R _ o i A <br /> Morutonng Well ID W - t Date Performed 4 t By L <br /> Depth to Water S b Total Depth-til Measuring Point• T O (- <br /> Well Diameter � � Boring Diameter <br /> Well Volume. Boring Volume <br /> Minimum Purge Volume �' 'S Purge Method TUM I N <br /> Pump Depth- —_ Pump Rate "` _-�0 -27N Pump Size <br /> Time Depth to Residual Percent <br /> 1 Water (ft) Drawdown (ft) Recovery <br /> 10 <br /> Total Volume Purged C h-i- Time Finished Purging <br /> Depth to Water After Purging Maximum Drawdown <br /> 80% Recovery <br />' Time Analysis No. of Container Type preservative <br /> Containers and Size <br /> 10 , )o T�N C,1-7 2 G s VnK-7- Np <br /> IAC' KT � <br /> 10 ,r �a ��+ m l�ti1. I r��'� � ►�� �b <br /> Samples Collected By <br />