Laserfiche WebLink
' GROUNDWATER SAMPLING FIELD REPORT <br /> 1 Project Name CA-\--rnAYr bb t Project No / bi- a / R - o I A _ <br /> Morutonng Well ID M W - C (Z) Date Performed 1 9 By r ➢ (- <br /> Depth to Water- 6 -! Total Depth Measuring Point: C <br /> Well Diameter �j �! Boring Diameter b �r <br /> Well Volume o <br /> Boring Volume <br /> Minimum Purge Volume Z �� ' Purge Method M 10 <br /> Pump Depth �` Pump Rate O4 " 57� Pump Size Z i w AA <br /> Time Depth to Residual Percent <br /> Water (ft) Drawdown (ft) Recovery <br /> Total Volume Purged Ll S CAI— Time Finished Purging S <br /> Depth to Water After Purging Maximum Drawdown <br /> 80% Recovery <br /> Time Analysis No. of Container Type Preservative <br /> Containers and Size <br /> lgper. <br /> Z , N G A-r Z G L�M-y vok Nb <br /> `L -SI rrx �a o,,T o f Ifo <br /> Z 2L) IJP <br /> s <br /> Samples Collected By <br />