Laserfiche WebLink
GROUNDWATER SAMPLING FIELD REPORT <br /> Project Name A-- g Project No C 6 I ! 0( <br /> Monitoring Well ID - Z Date Performed A By ? '� <br /> Depth to Water/ Total Depth,,;??)- - Measuring Point 0 C <br /> Well Diameter. LI n iameter <br /> Well Volume �� _ Boring Volume <br /> Minimum Pure Volume Z �( , Pure Method UJB P <br /> S -- g — <br />' Pump Depth -ti Pump Rate <br /> ?6() - T Pump Size N N <br />' Time Depth to Residual Percent <br /> Water (ft) Drawdown (ft) Recovery <br /> 1 1 � � 5. �7- <br /> 3 <br /> 1 <br /> Total Volume Purged �f S G A-- Time Firushed Purging <br /> Depth to Water After Purging l Maximum Drawdown <br /> 80% Recovery <br /> Time Analysis No. of Container Type preservative <br /> Containers and Size <br /> )� s S TfH GVr Z �,UrS) VOAS No <br /> 1 5.3-- `P 1 <br /> U ~ <br /> Samples Collected By <br /> f <br />