Laserfiche WebLink
• Electrical schematic (commonly referred to as a "single line diagram") depicting electrical <br /> amperage loads, circuit designs for the VES and meter base/circuit breaker box construction <br /> i <br /> details. <br /> Process and instrumentation diagram which depicts wells, manifold configuration, valves, <br /> sample ports, and process control and monitoring devices. <br /> • <br /> Construction details for wellheads, trench cross-sections, concrete pad, fence post footings, <br /> security bollards and well manifold. <br /> 7_4 Schedule <br /> A proposed time schedule for the design, permitting, construction and start-up of a vapor extraction <br /> system for the subject site is presented below. The schedule assumes time frames for regulatory <br /> approvals, bid solicitations and PG&E lead time for the new utility services. <br /> Activi Estimated Start Date Estimated Completion Date <br /> Corrective Action NA December 1996 <br /> Plan Approval <br /> Air Quality Permitting March 1997 March 1997 <br /> SN UD Service Applications March 1997 March 1997 <br /> Engineering Design April 1997 May 1997 <br /> Solicit Construction Bids May 1997 May 1997 <br /> System Construction June 1997 June 1997 <br /> System Operation June 1997 Through 1998 <br /> 1 <br /> r !` <br /> i <br /> Project No.58100-06-11C -11- December 17,1996 <br />