Laserfiche WebLink
Caltrans Construction <br /> Division <br /> x <br /> Office , <br /> x Office <br /> I <br /> x <br /> Trailer <br /> x <br /> MWA2 <br /> x <br /> - <br /> --xx—x—x—x—x—x—xx——xx—x—xx—xx—xx—x—xx—x--x—x—x—x <br /> — <br /> x Chain Link Fence <br /> I <br /> x <br /> c MW-9O <br /> x� <br /> _, Storage Warehouse <br /> P <br /> X a • <br /> IU �MW-8 • <br /> BMW-7 <br /> X <br /> Approximate Lateral Limits <br /> of TPHg Impaced Soil <br /> LU Driveway <br /> •$8-2 <br /> Uj <br /> �UW 1 VW-2 Concrete B1111W-1 <br /> `" 1 Y 1 ■ Former Pump Island <br /> = II SB-3 <br /> m x �MW-11 <br /> STOCKTON <br /> MW 3 Building p <br /> = I •SB 1, MW s YARD <br /> FACILITY <br /> X <br /> o Approximate Location <br /> of Underground Former Pump Island <br /> Fuel Tank Cavity <br /> Concrete <br /> BMW-2 <br /> Driveway <br /> X, OMW-4 <br /> • OMW-5 <br /> x <br /> x <br /> Maintenance Facility <br /> x <br /> x <br /> LEGEND: <br /> O MW-4 through MW-12; GEOCON x oMW-10 <br /> Groundwater Monitoring Wells I • • <br /> x <br /> MW-1 through MW-3; Alton Geoscience I ENVIRONMENTAL CONSULTANTS INCORPORATED <br /> Groundwater Monitoring Wells, March 1992 3235 SUNRISE BLVD.-SUITE 6-RANCHO CORDO VA,CALIFORNIA 95742 <br /> x <br /> PHONE 916 852-9118-FAX 916852-9132 <br /> • Sand SB 2; Alton Geoscience I Caltrans Stockton Yard Maintenance Facility <br /> Soiloil Borings, March 1992 y <br /> ■ SB-3,GEOCON Soil Boring 1604 South B Street ESTIMATED <br /> 0 40 Stockton, California LATERAL LIMITS <br /> VW-1 &VW-2; GEOCON Vapor Extraction Wells GEOCON Proj. No. S8100-06-11C OF TPHg IN SOIL <br /> Approx. Scale in Feet <br /> Task Order No. 10-911175-12 December 1996 Figure 6 <br />