My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANNER
>
6437
>
2900 - Site Mitigation Program
>
PR0526345
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 3:57:12 PM
Creation date
2/5/2019 3:45:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0526345
PE
2957
FACILITY_ID
FA0017827
FACILITY_NAME
FLAG CITY SHELL
STREET_NUMBER
6437
Direction
W
STREET_NAME
BANNER
STREET_TYPE
ST
City
LODI
Zip
95242
APN
05532019
CURRENT_STATUS
01
SITE_LOCATION
6437 W BANNER ST
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> New West Stations, Inc. -2- <br /> investigative workplanlCorrective Action Plan (CAP)before performing any work. This phasing process <br /> and the workplan/CAP requirements were intended to: <br /> 1. help the responsible party undertake the necessary corrective action in a cost-effective,efficient and <br /> timely manner; <br /> 2. enable the regulatory agency to review and approve the proposed cost-effective corrective action <br /> alternative before any corrective action work was performed; and <br /> 3. ensure the Fund will only reimburse the most cost-effective corrective action alternative required by <br /> the regulatory agency to achieve the minimum cleanup necessary to protect human health, safety and <br /> the environment. <br /> In some limited situations interim cleanup will be necessary to mitigate a demonstrated immediate <br /> hazard to public health, or the environment. Program regulations allow the responsible party to undertake <br /> interim remedial action after: (1)notifying the regulatory agency of the proposed action,and; (2) <br /> complying with any requirements that the regulatory agency may set. Interim remedial action should only <br /> be proposed when necessary to mitigate an immediate demonstrated hazard.Implementing interim <br /> remedial action does not eliminate the requirement for a CAP and an evaluation of the most cost- <br /> effective corrective action alternative. <br /> Three bids: Only corrective action costs required by the regulatory agency to protect human health, <br /> safety and the environment can be claimed for reimbursement. You must comply with all regulatory <br /> agency time schedules and requirements and you must obtain three bids for any required corrective <br /> action. If you do not obtain three bids or a waiver of the three-bid requirement, reimbursement is not <br /> assured and costs may be rejected as ineligible. <br /> If you have any questions,please contact me at(916)341-5761. <br /> Sincerely, <br /> A <br /> Barbara Rempel <br /> Claims Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> cc: Mr. Brian Newman " Ms.Margaret Lagorio J <br /> RWQCB,Reg. 5 - Sacramento San Joaquin County EBD <br /> 11020 Sun Center Drive 304 E Weber Ave, 3rd Floor <br /> Rancho Cordova,CA 95670 Stockton, CA 95202-2708 <br /> California Environmental Protection Agency <br /> �.o� <br /> Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.