My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANNER
>
6437
>
2900 - Site Mitigation Program
>
PR0526345
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 3:55:29 PM
Creation date
2/5/2019 3:48:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526345
PE
2957
FACILITY_ID
FA0017827
FACILITY_NAME
FLAG CITY SHELL
STREET_NUMBER
6437
Direction
W
STREET_NAME
BANNER
STREET_TYPE
ST
City
LODI
Zip
95242
APN
05532019
CURRENT_STATUS
01
SITE_LOCATION
6437 W BANNER ST
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i S .r • • <br /> pressure;or,well identification number and depth interval of <br /> screen. <br /> Typical sampling ports consist of a 1/4—inch ball valve fitted <br /> With a 3/16-inch hose barb to forth a slip stream from the <br /> sample source. <br /> The sampling procedure requires one end of the tubing be <br /> slipped over the sample port hose barb and the other end <br /> over the diaphragm pump inlet hose barb to form an air-tight <br /> connection. The sampling pump is then started and the <br /> pump is purged for 1 minute with the vapor to be sampled. <br /> Following purging,the discharge of the pump is then <br /> connected to the'Tedlar"bag using a section of 3116-inch <br /> tubing.The pump is restarted and the bag is opened and <br /> allowed to fill to approximately 314 of its capacity. Caution <br /> should be taken not to overfill the sampling bag. The sample <br /> is placed in a non-refrigerated dry cooler with sufficient <br /> packing to prevent damage during transport. Cooling <br /> samples will cause condensation of moisture within the <br /> sample,thereby distorting the laboratory analysis. <br /> For quality control purposes,a duplicate vapor sample <br /> should be collected from each sampling port. This sample is <br /> then put on hold at the laboratory pending initial analysis. To <br /> ensure quality control and minimize the potential for cross- <br /> contamination prior to and during sampling,the diaphragm <br /> pump is thoroughly purged for approximately 5 minutes with <br /> nitrogen or clean air(i.e.,compressed clean air). A"blank" <br /> sample of the discharged air is raptured in a"Tedlar"bag at <br /> the end of the purging procedure and may be analyzed to <br /> ensure the purging was effective. <br /> To minimize the potential for cross-contamination between <br /> air samples,the polyethylene tubing,if not sample dedicated, <br /> is thoroughly cleaned and rinsed. <br /> Vapor samples are subject to very limited holding times, <br /> typically 48 hours. Thus,care must taken to avoid delays in <br /> submittal of vapor samples to the laboratory. In the event the <br /> vapor samples cannot be submitted to the analytical <br /> laboratory on the same day they are collected,they are to be <br /> temporarily stored in the dry,non-refrigerated,packed cooler <br /> until the very first opportunity for submittal well within the <br /> required holding time,taking into account the time needed for <br /> shipment to and receipt by the laboratory. <br />
The URL can be used to link to this page
Your browser does not support the video tag.