My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANNER
>
6437
>
2900 - Site Mitigation Program
>
PR0526345
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 3:55:29 PM
Creation date
2/5/2019 3:48:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526345
PE
2957
FACILITY_ID
FA0017827
FACILITY_NAME
FLAG CITY SHELL
STREET_NUMBER
6437
Direction
W
STREET_NAME
BANNER
STREET_TYPE
ST
City
LODI
Zip
95242
APN
05532019
CURRENT_STATUS
01
SITE_LOCATION
6437 W BANNER ST
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 July 2012 <br /> AGE-NC Project No. 10-1801 <br /> Page 5 of 5 <br /> equipped and 8.25-inch hollow stem augers. Priorto well destruction, each well casing will <br /> be sounded with a Solinst water level meter to ensure that no obstructions are present in <br /> the casings. Thereafter,the drill rig hoist will be utilized to remove each monitoring well box <br /> steel ring. <br /> Monitoring wells MW-4A, MW-7A and MW-20A shall be attempted to be destroyed by <br /> connecting a cable to the top of the well casing and removing the entire well casing and <br /> cement seal with the drill rig hoist. Thereafter, the well casing/cement seal void space will <br /> be backfilled utilizing portland type II grout. A ratio of three gallons water for every <br /> 50-pound sack of portland cement will be utilized in preparation of the grout mixture. Each <br /> well will be completely backfilled to surface grade with the portland cement grout mixture. <br /> Soil cuttings generated during the popsicle method well abandonment activities will be <br /> containerized in a 10-yard soil bin and temporarily stored at the Flag City Shell site for <br /> future disposal to a Class II landfill (i.e. Forward Landfill). <br /> 3.4. WELL DESTRUCTION REPORTING <br /> Following the completion of the proposed scope of work, a well destruction report will be <br /> prepared.The report will include a description ofthe work performed and will document the <br /> disposal of all well materials, soil cuttings and rinseate. The report will be in a format <br /> acceptable to the SJCEHD and the CVRWQCB guidelines, and will be reviewed and <br /> signed by a California Professional Geologist. <br /> Advanced CeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.